How To Fix AP249 - Imposible asignar porque la solicitud de medida ya está asignada


SAP Error Message - Details

  • Message type: E = Error

  • Message class: AP - Investment program messages

  • Message number: 249

  • Message text: Imposible asignar porque la solicitud de medida ya está asignada

  • Show details Hide details
  • ¿Qué causa este problema?

    You tried to display or change the assignment of a WBS element to a
    program position. However, the system determined that the top WBS
    element that is above this WBS element in the hierarchy is itself
    already assigned to appropriation request &V1&, and this appropriation
    request is assigned to a program position.
    Within a WBS sub-tree that is specified by a top WBS element, only one
    of the following is allowed:
    <ZH>Either</> WBS elements are assigned directly to program positions.
    <ZH>Or</> the top WBS element is assigned to an appropriation request,
    and the appropriation request is then assigned to a program position.

    Respuesta del sistema

    The function is not carried out.

    Extracto de mensaje de error del sistema SAP. Copyright SAP SE.


Smart SAP Assistant

  • ¿Cuál es la causa y la solución del error de SAP AP249 - Imposible asignar porque la solicitud de medida ya está asignada ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Mensajes de error de SAP relacionados

Haga clic en los enlaces a continuación para ver los siguientes mensajes relacionados:

Haga clic en este enlace para buscar todos los mensajes de SAP.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker