How To Fix AP249 - Imposible asignar porque la solicitud de medida ya está asignada


AP249 - Overview

  • Message type: E = Error

  • Message class: AP - Investment program messages

  • Message number: 249

  • Message text: Imposible asignar porque la solicitud de medida ya está asignada

  • Show details Hide details
  • ¿Qué causa este problema?

    You tried to display or change the assignment of a WBS element to a
    program position. However, the system determined that the top WBS
    element that is above this WBS element in the hierarchy is itself
    already assigned to appropriation request &V1&, and this appropriation
    request is assigned to a program position.
    Within a WBS sub-tree that is specified by a top WBS element, only one
    of the following is allowed:
    <ZH>Either</> WBS elements are assigned directly to program positions.
    <ZH>Or</> the top WBS element is assigned to an appropriation request,
    and the appropriation request is then assigned to a program position.

    Respuesta del sistema

    The function is not carried out.

    Extracto de mensaje de error del sistema SAP. Copyright SAP SE.


Smart SAP Assistant

  • ¿Cuál es la causa y la solución del error de SAP AP249 - Imposible asignar porque la solicitud de medida ya está asignada ?







Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Mensajes de error de SAP relacionados

Haga clic en los enlaces a continuación para ver los siguientes mensajes relacionados:

Haga clic en este enlace para buscar todos los mensajes de SAP.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant