Message type: E = Error
Message class: X4 - APO Core Interface: Interfaces for Manufacturing Orders
Message number: 527
Message text: Error in capacity requirement for suboperation &1/&2
An error occurred during the processing of a capacity requirement in
suboperation &V2& for operation &V1& of sequence &V3&. Note that no
sequence numbers can be specified in this message for operations or
parallel sequences inserted into the order by hand.
You can find the cause of the error in the subsequent message in the
application log. Rectify the cause of the error.
Technical Information:
The capacity requirement concerned relates to the work center with
KAPID &V4& .
Error message extract from SAP system. Copyright SAP SE.
X4527
- Error in capacity requirement for suboperation &1/&2 ?The SAP error message X4527, which states "Error in capacity requirement for suboperation &1/&2," typically occurs in the context of production planning and capacity management. This error indicates that there is an issue with the capacity requirements for a specific suboperation in a production order or routing.
Causes:
- Missing or Incorrect Capacity Data: The capacity data for the work center or operation may be missing or incorrectly configured.
- Invalid Operation Sequence: The sequence of operations in the routing may not be valid, leading to issues in capacity planning.
- Capacity Overload: The capacity of the work center may be overloaded, causing the system to be unable to schedule the operation.
- Incorrectly Defined Suboperations: The suboperations may not be defined correctly in the routing or may not correspond to the work center's capabilities.
- Resource Availability: Resources required for the suboperation may not be available or may be incorrectly assigned.
Solutions:
- Check Capacity Data: Verify that the capacity data for the relevant work center is correctly defined. Ensure that the available capacity matches the requirements of the production order.
- Review Routing: Check the routing for the production order to ensure that all operations and suboperations are correctly defined and sequenced.
- Adjust Capacity: If the work center is overloaded, consider adjusting the capacity or rescheduling the production order to a time when capacity is available.
- Validate Suboperations: Ensure that all suboperations are correctly defined and that they correspond to the capabilities of the work center.
- Resource Assignment: Check the assignment of resources to the suboperation to ensure that they are available and correctly configured.
Related Information:
CO02
(Change Production Order) or CR02
(Change Routing) to review and modify production orders and routings.If the issue persists after checking these areas, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning and capacity management.
Get instant SAP help. Start your 7-day free trial now.
X4526
Error in capacity requirement for phase or operation &1
What causes this issue? An error occurred during the processing of a capacity requirement for phase or operation &V1&.System Response The sy...
X4524
An error occurred for operation or phase &1
What causes this issue? An error occurred during the processing of the operation or phase &V1&.System Response The system issues an error me...
X4528
Error in capacity requirement for secondary resource &1/&2
What causes this issue? An error occurred during the processing of a capacity requirement in secondary resource &V2& for operation &V1&am...