Message type: E = Error
Message class: X4 - APO Core Interface: Interfaces for Manufacturing Orders
Message number: 528
Message text: Error in capacity requirement for secondary resource &1/&2
An error occurred during the processing of a capacity requirement in
secondary resource &V2& for operation &V1&.
You can find the cause of the error in the subsequent message in the
application log. Rectify the cause of the error.
Technical Information:
The capacity requirement concerned relates to the work center with
KAPID &V3& .
Error message extract from SAP system. Copyright SAP SE.
X4528
- Error in capacity requirement for secondary resource &1/&2 ?The SAP error message X4528, which states "Error in capacity requirement for secondary resource &1/&2," typically occurs in the context of production planning and capacity management. This error indicates that there is an issue with the capacity requirements for a secondary resource (like a machine or labor) in a production order or a planned order. Causes: Incorrect Resource Configuration: The secondary resource may not be properly configured in the system, leading to discrepancies in capacity calculations. Capacity Overload: The secondary resource may be overloaded, meaning that the planned production exceeds the available capacity. Missing or Incorrect Master Data: There may be missing or incorrect data in the resource master records, such as capacity data, working times, or availability. Scheduling Conflicts: There may be scheduling conflicts with other orders that are using the same secondary resource. Incorrect Order Settings: The production order or planned order may have incorrect settings that do not align with the resource's capabilities. Solutions: Check
Get instant SAP help. Sign up for our Free Essentials Plan.
X4527
Error in capacity requirement for suboperation &1/&2
What causes this issue? An error occurred during the processing of a capacity requirement in suboperation &V2& for operation &V1& of ...
X4526
Error in capacity requirement for phase or operation &1
What causes this issue? An error occurred during the processing of a capacity requirement for phase or operation &V1&.System Response The sy...
X4529
Error for secondary resource &1/&2
What causes this issue? An error occurred during the processing of secondary resource &V2& for operation &V1&.System Response The sy...
X4530
Error in a cross-order relationship (PP/PI)
What causes this issue? An error occurred during the processing of data for the cross-order relationship between operation/phase &V1& in proc...
Click on this link to search all SAP messages.