Message type: E = Error
Message class: X4 - APO Core Interface: Interfaces for Manufacturing Orders
Message number: 526
Message text: Error in capacity requirement for phase or operation &1
An error occurred during the processing of a capacity requirement for
phase or operation &V1&.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
You can find the cause of the error in the subsequent message in the
application log. Rectify the cause of the error.
Technical Information:
The capacity requirement concerned relates to the work center with
KAPID &V2& .
Error message extract from SAP system. Copyright SAP SE.
X4526
- Error in capacity requirement for phase or operation &1 ?The SAP error message X4526, which states "Error in capacity requirement for phase or operation &1," typically occurs in the context of production planning and capacity management. This error indicates that there is an issue with the capacity requirements for a specific operation or phase in a production order or process.
Causes:
- Missing or Incorrect Data: The operation or phase may be missing required data, such as capacity requirements, work center assignments, or routing information.
- Capacity Overload: The work center may be overloaded, meaning that the planned capacity exceeds the available capacity for the specified time period.
- Incorrect Configuration: There may be configuration issues in the work center or routing that lead to incorrect capacity calculations.
- Scheduling Conflicts: Conflicts in scheduling, such as overlapping operations or phases that cannot be executed simultaneously, can also trigger this error.
- Resource Availability: The resources required for the operation may not be available, leading to capacity issues.
Solutions:
- Check Work Center Configuration: Verify that the work center is correctly configured with the appropriate capacity settings, including available capacity and shift definitions.
- Review Routing Information: Ensure that the routing for the production order is complete and accurate, including all necessary operations and phases.
- Analyze Capacity Load: Use transaction codes like CM01 (Capacity Planning) or CM21 (Capacity Leveling) to analyze the capacity load on the work center and identify any overloads.
- Adjust Production Orders: If there are scheduling conflicts or overloads, consider rescheduling or adjusting the production orders to balance the load across available work centers.
- Check Resource Availability: Ensure that all required resources (machines, tools, labor) are available and not booked for other operations during the planned time.
- Consult SAP Notes: Check for any relevant SAP Notes or updates that may address known issues related to this error message.
Related Information:
If the issue persists after checking these areas, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning and control.
Get instant SAP help. Sign up for our Free Essentials Plan.
X4524
An error occurred for operation or phase &1
What causes this issue? An error occurred during the processing of the operation or phase &V1&.System Response The system issues an error me...
X4523
An error occurred for suboperation &1 / &2 of a parallel sequence
What causes this issue? An error occurred during the processing of suboperation &V2& of operation &V1& for a parallel sequence. The s...
X4527
Error in capacity requirement for suboperation &1/&2
What causes this issue? An error occurred during the processing of a capacity requirement in suboperation &V2& for operation &V1& of ...
X4528
Error in capacity requirement for secondary resource &1/&2
What causes this issue? An error occurred during the processing of a capacity requirement in secondary resource &V2& for operation &V1&am...
Click on this link to search all SAP messages.