Do you have any question about this error?
Message type: E = Error
Message class: X4 - APO Core Interface: Interfaces for Manufacturing Orders
Message number: 210
Message text: CDP order &1 cannot be processed
The CDP order &V1& transferred from APO cannot be processed.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
X4210
- CDP order &1 cannot be processed ?The SAP error message X4210 indicates that a CDP (Customer Demand Planning) order cannot be processed due to various reasons. This error typically arises in the context of SAP Advanced Planning and Optimization (APO) or SAP Integrated Business Planning (IBP) when there are issues with the order data or configuration.
Possible Causes:
- Data Inconsistencies: There may be inconsistencies in the master data or transaction data related to the CDP order.
- Missing Configuration: Required configuration settings for the CDP process may be missing or incorrectly set up.
- Invalid Status: The order may be in a status that does not allow processing (e.g., it may be locked or in a closed status).
- Resource Availability: There may be issues with resource availability that prevent the order from being processed.
- Planning Version Issues: The planning version used for the CDP order may not be active or may have been deleted.
- Time Period Issues: The order may fall outside of the defined planning horizon or time periods.
Solutions:
- Check Data Consistency: Review the master data (e.g., material master, customer master) and transaction data for any inconsistencies. Ensure that all necessary data is complete and accurate.
- Review Configuration: Verify that all necessary configuration settings for CDP are correctly set up in the system. This includes checking the planning area, planning version, and any relevant settings in the APO/IBP configuration.
- Check Order Status: Look at the status of the CDP order to ensure it is in a state that allows processing. If it is locked or closed, you may need to unlock or reopen it.
- Resource Check: Ensure that the resources required for processing the order are available and not overbooked or constrained.
- Validate Planning Version: Confirm that the planning version associated with the CDP order is active and has not been deleted or archived.
- Adjust Time Periods: Make sure that the order falls within the defined planning horizon. If necessary, adjust the planning periods to include the order.
Related Information:
/SAPAPO/CDP
or /SAPAPO/SDP
to access relevant data and settings.By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
X4209
Component &1 of order &2 is deleted in the APO order
What causes this issue? The component &V1&, which does not exist in the ECC order, has been transferred from SAP APO with order &V2&....
X4208
Error during conversion of planned order &1 : Check failed
What causes this issue? If the planned order conversion is triggered from SAP APO, a check must be made on the ECC side to see if it is possible for ...
X4211
Operation &1 of order &2 is deleted in APO
What causes this issue? The operation &V1&, which does not exist in the ECC order, has been transferred from SAP APO with order &V2&....
X4212
Error during key comparison (manufacturing order)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.