Message type: E = Error
Message class: X4 - APO Core Interface: Interfaces for Manufacturing Orders
Message number: 208
Message text: Error during conversion of planned order &1 : Check failed
If the planned order conversion is triggered from SAP APO, a check must
be made on the ECC side to see if it is possible for the planned order
to be converted. This check has failed.
The conversion of the planned order &V1& is terminated.
To find out the cause of this, you can try to convert the planned order
in SAP ECC.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
X4208
- Error during conversion of planned order &1 : Check failed ?The SAP error message X4208, which states "Error during conversion of planned order &1: Check failed," typically occurs during the conversion of planned orders to production orders in the SAP system. This error can arise due to various reasons, and understanding the cause is essential for finding a solution.
Causes:
- Missing Master Data: The material master, bill of materials (BOM), or routing information may be incomplete or missing.
- Configuration Issues: There may be issues with the configuration settings in the production planning module.
- Capacity Constraints: If there are capacity constraints in the work centers, the system may fail to convert the planned order.
- Invalid Status: The planned order may be in a status that does not allow conversion.
- Material Availability: The required materials for the planned order may not be available or may not meet the necessary stock levels.
- User Authorizations: The user may not have the necessary authorizations to perform the conversion.
Solutions:
- Check Master Data: Ensure that all relevant master data (material master, BOM, routing) is complete and correctly configured.
- Review Configuration: Check the configuration settings in the production planning module to ensure they are set up correctly.
- Analyze Capacity: Review the capacity of work centers to ensure that there are no constraints preventing the conversion.
- Check Planned Order Status: Verify the status of the planned order to ensure it is eligible for conversion.
- Material Availability Check: Perform a stock availability check to ensure that all required materials are available for the planned order.
- User Authorizations: Confirm that the user has the necessary authorizations to convert planned orders.
Related Information:
If the problem continues after checking these areas, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning.
Get instant SAP help. Start your 7-day free trial now.
X4207
Planned order &1 could not be deleted in SAP ECC
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
X4206
The creation of items is not supported
What causes this issue? An order containing an item that does not exist in the ECC order was sent from SAP APO to SAP ECC. Integration cannot be used...
X4209
Component &1 of order &2 is deleted in the APO order
What causes this issue? The component &V1&, which does not exist in the ECC order, has been transferred from SAP APO with order &V2&....
X4210
CDP order &1 cannot be processed
What causes this issue? The CDP order &V1& transferred from APO cannot be processed.System Response The system issues an error message and w...