Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix WRPLCHK009 - Activity & successfully completed


SAP Error Message - Details

  • Message type: E = Error

  • Message class: WRPLCHK - Retail: Replenishment

  • Message number: 009

  • Message text: Activity & successfully completed

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message WRPLCHK009 - Activity & successfully completed ?

    SAP Error Message:
    WRPLCHK009 - Activity & successfully completed


    Meaning / Cause:

    The message WRPLCHK009 typically appears in the context of Work Package or Work Order processing in SAP Plant Maintenance (PM) or Project System (PS) modules. The message indicates that a particular activity (operation or task) has already been successfully completed.

    This message is informational and usually occurs when you try to perform an action on an activity that is already marked as completed, such as:

    • Trying to confirm or complete an activity that is already confirmed/completed.
    • Attempting to change or process an activity that is no longer open for changes because it has been finalized.

    Typical Causes:

    • The activity status is set to Technically Completed (TECO) or Confirmed.
    • The system detects that the activity has already been processed successfully.
    • User attempts to repeat an action that is only valid for open or in-process activities.

    Solution / How to Handle:

    1. Check Activity Status:

      • Go to the activity in question (e.g., in IW32 for maintenance orders or CJ20N for projects).
      • Verify the status of the activity. If it is already completed (TECO or confirmed), no further confirmation or completion is needed.
    2. Avoid Duplicate Processing:

      • If you intended to confirm or complete the activity, no action is needed because it is already done.
      • If you need to make changes, you may need to reverse the completion status first (e.g., set the order or activity back to a modifiable status).
    3. Reversal of Completion (if necessary):

      • Use transaction codes like IW38 or IW32 to reverse the TECO status if changes are required.
      • Be cautious with status reversals as they may affect reporting and costing.
    4. Check for System or User Errors:

      • Ensure that the user is not mistakenly trying to process the same activity multiple times.
      • Review the process flow to confirm that the activity lifecycle is correctly followed.

    Related Information:

    • Transaction Codes:
      • IW31 / IW32 / IW33 — Create/Change/Display Maintenance Orders
      • CJ20N — Project Builder (for project activities)
      • IW38 — Change Multiple Orders
    • Status Management:
      • TECO (Technically Completed) status means no further processing is expected.
      • CNF (Confirmed) means the activity has been confirmed as done.
    • SAP Notes / Documentation:
      • Check SAP OSS notes related to WRPLCHK messages for any specific patches or updates.
      • Review SAP Help Portal for Work Order and Project System activity processing.

    Summary:

    • WRPLCHK009 is an informational message indicating the activity is already completed.
    • No further confirmation or completion is needed.
    • If changes are required, reverse the completion status first.
    • Ensure correct process flow to avoid duplicate processing attempts.

    If you provide the exact transaction or scenario where this message appears, I can help with more tailored advice.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant