Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix WRF_BUDGET101 - Process ID for application PPW not filled


SAP Error Message - Details

  • Message type: E = Error

  • Message class: WRF_BUDGET -

  • Message number: 101

  • Message text: Process ID for application PPW not filled

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message WRF_BUDGET101 - Process ID for application PPW not filled ?

    Certainly! Here's a detailed explanation for the SAP error message:


    SAP Error Message:

    WRF_BUDGET101 Process ID for application PPW not filled


    Cause:

    This error occurs when the system expects a Process ID (also known as a Workflow ID or Process Instance ID) for the application PPW (which stands for Planning Process Workflow or related budget planning workflow), but this ID is missing or not maintained in the relevant data or configuration.

    In other words, during budget planning or workflow processing, the system tries to reference a workflow process instance but finds that the Process ID field is empty or not set.


    When does it occur?

    • During budget planning or budget workflow processing.
    • When triggering or processing workflow tasks related to budget planning (PPW).
    • When the system tries to link budget data with a workflow process but the linkage is missing.

    Possible Causes:

    • The workflow process instance was not created or not saved properly.
    • Customizing or configuration for budget workflow is incomplete or incorrect.
    • The budget planning application is trying to access a workflow process that was never started.
    • Data inconsistency or missing data in the budget planning tables.
    • User exit or BAdI implementation that should fill the Process ID is not working or missing.

    Solution:

    1. Check Workflow Configuration:

      • Verify that the workflow for the budget planning application (PPW) is correctly configured.
      • Use transaction SWDD (Workflow Builder) or PFTC to check the workflow definitions.
      • Ensure that the workflow is started properly and the Process ID is generated.
    2. Check Budget Planning Customizing:

      • Use transaction SPRO and navigate to the budget planning workflow customizing.
      • Verify that the workflow is assigned correctly to the budget planning application.
    3. Check Data Consistency:

      • Check the relevant budget planning tables (e.g., PPW_BUDGET, PPW_PROCESS) to see if the Process ID field is filled.
      • If missing, investigate why the workflow process was not started or linked.
    4. Restart or Recreate Workflow Process:

      • If the workflow process instance is missing, try to restart the budget planning workflow.
      • You may need to manually start the workflow or trigger the budget planning process again.
    5. Check User Exits / BAdIs:

      • If there are custom enhancements related to budget workflow, verify that they correctly fill the Process ID.
      • Debug the code to ensure the Process ID is assigned.
    6. SAP Notes and Support:

      • Check SAP Notes for any known issues related to WRF_BUDGET101.
      • If the problem persists, consider raising a support ticket with SAP, providing details of the error and system logs.

    Related Information:

    • Transaction Codes:

      • PPW_BUDGET – Budget Planning
      • SWI1 – Workflow Log
      • SWIA – Work Item Administration
      • SWDD – Workflow Builder
      • PFTC – Task Maintenance
    • Tables:

      • PPW_BUDGET – Budget planning data
      • PPW_PROCESS – Budget workflow process data
    • SAP Modules:

      • Public Sector Management (PSM)
      • Budget Planning and Control

    Summary:

    The error WRF_BUDGET101 Process ID for application PPW not filled indicates that the system expects a workflow process ID for budget planning but it is missing. The solution involves checking workflow configuration, ensuring the workflow process is started and linked properly, verifying data consistency, and reviewing any custom enhancements.


    If you provide more context (e.g., when exactly the error occurs, system version), I can help with more specific steps or debugging tips.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker