Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix WRF_APC274 - No difference between planned and assigned quantities


SAP Error Message - Details

  • Message type: E = Error

  • Message class: WRF_APC - Messages for Operational Assortment Planning and Control

  • Message number: 274

  • Message text: No difference between planned and assigned quantities

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message WRF_APC274 - No difference between planned and assigned quantities ?

    Certainly! Here's a detailed explanation for the SAP error message WRF_APC274: No difference between planned and assigned quantities:


    Error Message

    WRF_APC274: No difference between planned and assigned quantities


    Cause

    This error occurs in the context of SAP Advanced Planning and Optimization (APO), specifically during the production order confirmation or capacity leveling process.

    • The system tries to confirm or assign quantities for a production order or a planned order.
    • However, the planned quantity and the already assigned quantity are the same.
    • This means there is no difference or delta to be confirmed or assigned.
    • Essentially, the system detects that the operation you are trying to perform is redundant because the quantities have already been fully assigned or confirmed.

    When does it typically occur?

    • When you try to confirm a production order or planned order that has already been fully confirmed.
    • When capacity assignments or confirmations are attempted but no new quantity remains to be processed.
    • During capacity leveling or capacity confirmation in SAP APO, if the system finds no difference between what was planned and what has already been assigned.

    Solution / How to resolve

    1. Check the quantities:

      • Verify the planned quantity and the assigned/confirmed quantity for the order.
      • Use transaction codes like COHV, CO02, or APO transactions like /SAPAPO/CCP1 to check order details.
    2. Avoid redundant confirmations:

      • If the order is already fully confirmed or assigned, no further confirmation is needed.
      • Skip the confirmation step or adjust the quantities if partial confirmation is intended.
    3. Adjust planned quantities if necessary:

      • If the planned quantity is incorrect or needs to be changed, adjust it before confirmation.
    4. Check integration and data consistency:

      • Sometimes, data inconsistencies between SAP ERP and APO can cause this error.
      • Run consistency checks and ensure that the data is synchronized properly.
    5. Review user actions:

      • Ensure that the user is not trying to confirm or assign quantities multiple times without changes.

    Related Information

    • SAP Notes: Check SAP Notes related to WRF_APC274 for any patches or updates.
    • Transactions involved:
      • COHV (Mass order processing)
      • CO02 (Change production order)
      • /SAPAPO/CCP1 (Capacity leveling in APO)
    • APO Capacity Planning: This error is common in capacity confirmation and leveling scenarios.
    • Integration: Ensure smooth integration between SAP ERP PP and SAP APO SNP/PPDS modules.

    Summary

    Aspect Description
    Cause Attempt to confirm or assign quantities when planned and assigned quantities are identical.
    Effect System throws error WRF_APC274, blocking redundant confirmation or assignment.
    Solution Verify quantities, avoid redundant confirmations, adjust planned quantities if needed.
    Context SAP APO capacity confirmation, production order confirmation, capacity leveling.

    If you need help with specific transaction steps or further troubleshooting, feel free to ask!

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker