Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix WRF_APC259 - Dateline not yet created; display not possible


SAP Error Message - Details

  • Message type: E = Error

  • Message class: WRF_APC - Messages for Operational Assortment Planning and Control

  • Message number: 259

  • Message text: Dateline not yet created; display not possible

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message WRF_APC259 - Dateline not yet created; display not possible ?

    Certainly! Here's a detailed explanation for the SAP error message WRF_APC259: Dateline not yet created; display not possible:


    Error Message

    WRF_APC259: Dateline not yet created; display not possible


    Cause

    This error occurs in SAP Advanced Planning and Optimization (APO), specifically in the context of the Demand Planning (DP) or Supply Network Planning (SNP) modules, when you try to display or work with a planning dateline that has not yet been created or initialized in the system.

    • The dateline in APO refers to the time horizon or planning period for which data (such as demand, supply, or production plans) is maintained.
    • If the dateline for a particular planning version, product, or location does not exist, the system cannot display or process planning data, resulting in this error.
    • This situation often arises when:
      • The planning version or planning area has not been initialized.
      • The planning horizon has not been set up or generated.
      • The system has not yet created the necessary time buckets or planning periods for the requested data.

    Solution

    To resolve this error, you need to ensure that the dateline is properly created and initialized. The steps typically include:

    1. Initialize the Planning Version / Planning Area:

      • Use transaction /SAPAPO/SDP94 (Demand Planning) or /SAPAPO/SNP94 (Supply Network Planning) to initialize the planning version.
      • Initialization creates the dateline and the necessary time buckets for the planning horizon.
    2. Check and Maintain Planning Horizon:

      • Verify that the planning horizon is correctly defined in the planning version.
      • Adjust the planning horizon if necessary to cover the required periods.
    3. Run Planning Initialization Jobs:

      • Execute background jobs or planning initialization programs that create the dateline.
      • For example, run the planning initialization report /SAPAPO/INIT_PLANNING or similar, depending on your APO version.
    4. Check Time Buckets and Planning Book Settings:

      • Ensure that the planning book and data views are correctly configured with the appropriate time buckets.
      • If the time buckets are missing or incorrectly defined, the dateline cannot be created.
    5. Transport and System Consistency:

      • If this error occurs after a transport or system copy, verify that all relevant customizing and master data have been transported correctly.
      • Re-initialize the planning version if necessary.

    Related Information

    • Transactions:

      • /SAPAPO/SDP94 - Demand Planning Initialization
      • /SAPAPO/SNP94 - Supply Network Planning Initialization
      • /SAPAPO/MC90 - Planning Book and Data View maintenance
      • /SAPAPO/INIT_PLANNING - Planning initialization report (may vary)
    • Notes and Documentation:

      • SAP Note 0000000 (replace with actual note number if available) related to planning initialization errors.
      • SAP APO documentation on planning versions and dateline management.
    • Additional Tips:

      • Always check authorization and system logs if initialization fails.
      • Coordinate with your APO basis and functional team to ensure system consistency.
      • After initialization, verify that the dateline exists by checking the planning book or running reports.

    If you provide more context (e.g., module, transaction, or scenario), I can give more tailored advice.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker