Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: WL - Workflow: run-time messages
Message number: 855
Message text: Date & is not valid (plausibility check not fulfilled)
The date specified is invalid. It contains:
invalid characters (such as letters)
an invalid date unit (such as a month greater than 12 or more days than
the month contains).
The action was cancelled.
Enter a valid date. Please observe the validity criteria specified
above.
Error message extract from SAP system. Copyright SAP SE.
WL855
- Date & is not valid (plausibility check not fulfilled) ?The SAP error message WL855, which states "Date & is not valid (plausibility check not fulfilled)," typically occurs in the context of logistics or production planning when the system detects that a date entered does not meet certain predefined criteria or checks. This error is often related to the scheduling of operations, availability of resources, or other date-related validations in the system.
Causes:
- Invalid Date Format: The date entered may not be in the correct format expected by the system.
- Date Out of Range: The date may fall outside of the permissible range defined in the system settings (e.g., past dates, dates beyond the planning horizon).
- Plausibility Checks: The system has built-in checks to ensure that the date aligns with business rules, such as lead times, production schedules, or resource availability.
- Calendar Settings: The date may conflict with non-working days or holidays defined in the factory calendar.
- Configuration Issues: There may be issues with the configuration of the planning parameters or master data that affect date validation.
Solutions:
- Check Date Format: Ensure that the date is entered in the correct format as required by the SAP system.
- Verify Date Validity: Confirm that the date is within the acceptable range and does not fall on a non-working day or holiday.
- Review Planning Parameters: Check the planning parameters and settings in the system to ensure they are correctly configured.
- Adjust Calendar Settings: Review the factory calendar settings to ensure that the date does not conflict with non-working days.
- Consult Documentation: Refer to SAP documentation or help files for specific details on the plausibility checks that are being enforced for the transaction you are working with.
- Debugging: If you have access to technical support, consider debugging the transaction to identify the specific check that is failing.
Related Information:
By following these steps, you should be able to identify the cause of the WL855 error and implement a suitable solution.
Get instant SAP help. Sign up for our Free Essentials Plan.
WL854
Time & is not valid (plausibility check not fulfilled)
What causes this issue? The time specified is invalid. It contains: invalid characters (such as letters) an invalid time unit (such as hour greater t...
WL853
Work item &: Rejection not allowed
What causes this issue? Processing cannot be rejected for the work item in question.System Response The action was terminated and the work item rema...
WL856
Requested start & & is not in the future
What causes this issue? The requested start date for the work item is not in the future.System Response The action was terminated.How to fix this er...
WL857
Latest start date & & is not in the future
What causes this issue? The specified start date for the work item is not in the future.System Response The action was terminated.How to fix this er...
Click on this link to search all SAP messages.