Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix W0CSRS015 - Take into account the other fields for controlling the PDC procedure


SAP Error Message - Details

  • Message type: E = Error

  • Message class: W0CSRS - Customizing - SAP Retail Store

  • Message number: 015

  • Message text: Take into account the other fields for controlling the PDC procedure

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message W0CSRS015 - Take into account the other fields for controlling the PDC procedure ?

    Certainly! Here's detailed information about the SAP error message W0CSRS015:


    SAP Error Message: W0CSRS015

    Message Text:
    Take into account the other fields for controlling the PDC procedure.


    Cause

    This message typically occurs during the Production Data Collection (PDC) process in SAP when the system detects that the control of the PDC procedure requires consideration of additional fields or parameters that have not been properly maintained or are inconsistent.

    In other words, the system expects certain fields (such as control keys, operation numbers, or other PDC-related parameters) to be filled or aligned correctly to control the PDC procedure, but these fields are either missing, incomplete, or conflicting.


    Context

    • The message is related to PDC (Production Data Collection), which is used to record production confirmations, time data, and quantities.
    • It often appears when confirming production orders or when setting up the PDC system.
    • The system uses various fields to control how data is collected and processed in PDC, such as:
      • Control keys
      • Operation numbers
      • Work center data
      • PDC control parameters in routing or work center master data

    Solution

    1. Check PDC Control Fields:

      • Review the routing operations and ensure that the PDC control fields are correctly maintained.
      • Verify that the control keys and operation numbers are consistent and correctly assigned.
    2. Maintain PDC Parameters:

      • In the routing or work center master data, check the PDC-related fields.
      • Ensure that the PDC procedure control fields (e.g., PDC control indicator, confirmation control) are properly set.
    3. Review Customizing Settings:

      • Go to SPRO ? Production ? Confirmation ? PDC ? Define PDC Control and verify the settings.
      • Make sure that the PDC control procedure is correctly defined and assigned.
    4. Check for Missing or Conflicting Data:

      • Sometimes, the error arises if there are conflicting entries or missing data in the PDC control fields.
      • Correct any inconsistencies.
    5. Consult SAP Notes:

      • Check for any SAP Notes related to PDC and this message for specific patches or corrections.

    Additional Information

    • This message is a warning or error depending on the system configuration.
    • It is important to ensure that all relevant fields controlling the PDC procedure are maintained to avoid data collection errors.
    • Proper setup of PDC is crucial for accurate production reporting and shop floor data collection.

    Summary

    Aspect Details
    Message W0CSRS015: Take into account the other fields for controlling the PDC procedure
    Cause Missing or inconsistent PDC control fields in routing, work center, or confirmation data
    Solution Review and maintain PDC control fields, check routing and work center data, adjust customizing
    Related Areas Production Data Collection (PDC), Routing, Work Center, Confirmation

    If you need help with specific transaction codes or steps to check these fields, feel free to ask!

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author