Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: VQ - SD Archiving and Product Allocation
Message number: 280
Message text: No consumption intervals have been maintained.
No consumption intervals are entered in maintenance view V_T190V for
info structure &v1&.
During the check against product allocations with the cumulative
method, you can define consumption intervals that describe how many
periods are available for the check from before and after the checking
time.
If no intervals are defined, then all periods (before and after) are
used for the current check.
The consumption intervals are defined per info structure in maintenance
view V_T190V.
The product allocation check is speeded up if the consumption period is
restricted.
Error message extract from SAP system. Copyright SAP SE.
VQ280
- No consumption intervals have been maintained. ?Certainly! Here's a detailed explanation for the SAP error message VQ280 - No consumption intervals have been maintained:
Error Message
VQ280: No consumption intervals have been maintained
Cause
This error occurs in SAP when the system tries to perform a consumption-related process (such as consumption-based planning, material consumption analysis, or consumption data evaluation), but it cannot find any defined consumption intervals for the material or the relevant consumption data.
Consumption intervals define the time periods over which consumption data is collected and evaluated. If these intervals are not maintained or set up properly, the system cannot determine the consumption quantities, leading to this error.
Where It Occurs
Maintain Consumption Intervals:
Check Planning Parameters:
Maintain Consumption Data:
Check Material Master Settings:
Run MRP or Consumption Evaluation Again:
Transaction Codes:
SAP Notes:
Documentation:
Aspect | Details |
---|---|
Cause | No consumption intervals defined or maintained for the material or planning scenario. |
Effect | System cannot evaluate consumption data, leading to error VQ280. |
Solution | Maintain consumption intervals in material master and customizing; ensure consumption data exists. |
Where to Check | Material Master (MRP 2 view), Customizing (SPRO), Consumption data tables. |
If you need help with specific steps or transaction codes, feel free to ask!
Get instant SAP help. Sign up for our Free Essentials Plan.
VQ260
Remote Function Call (RFC) could not be carried out!
What causes this issue? The Remote Function Call (RFC) for copying the account assignment Customizing settings to the planning server (APO) could not...
VQ250
The period settings for the info structure do not agree
What causes this issue? The period settings for info structure &v1& for planning with &v2& and update with &v3& do not agree....
VQ281
Consumption intervals are not used!
What causes this issue? During the check against product allocation using the discrete method, the system does not take the consumption intervals int...
VQ282
More than &2 product allocation stpes have been defined for procedure &1.
What causes this issue? If too many product allocation steps are defined in a procedure, this can lead to performance problems during the availabilit...
Click on this link to search all SAP messages.