Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: VQ - SD Archiving and Product Allocation
Message number: 250
Message text: The period settings for the info structure do not agree
The period settings for info structure &v1& for planning with &v2& and
update with &v3& do not agree.
The same periods must be used for planning and updating, so that the
planned allocation quantity can be reduced / reserved by the order
entry quantity.
Product allocation is not carried out as planned.
Adjust either the planning periods via the planning parameters, or the
update periods via update activation for the info structure.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
VQ250
- The period settings for the info structure do not agree ?Certainly! Here's a detailed explanation for the SAP error message VQ250: "The period settings for the info structure do not agree":
Error Message:
VQ250 - The period settings for the info structure do not agree
Cause:
This error occurs when there is a mismatch or inconsistency in the period settings between the info structure and the data being posted or processed. Specifically, the period settings define the time intervals (e.g., monthly, quarterly) for which data is collected and stored in the info structure.
Common causes include:
Info structures in SAP Controlling (CO) are used to collect and analyze data over defined time periods. Each info structure has a period definition that specifies how data is aggregated (e.g., monthly, quarterly). If the data being posted or processed does not align with these period definitions, SAP raises this error to prevent inconsistent or incorrect data aggregation.
Check the Period Definition of the Info Structure:
Check the Posting Date / Period of the Data:
Adjust the Info Structure Period Settings if Necessary:
Check the Data Source or Posting Program:
Rebuild or Update the Info Structure:
Consult SAP Notes:
If you provide the exact context (e.g., transaction or process where the error occurs), I can help with more specific steps.
Get instant SAP help. Sign up for our Free Essentials Plan.
VQ249
The period settings for info structure &1 agree
What causes this issue? The period settings for the info structure for planning and updating agree. The same periods must be used for planning and up...
VQ248
Error during scheduling in product allocation!
What causes this issue? An error has occured in scheduling during date conversion in product allocation (e.g. during material availability date of AT...
VQ260
Remote Function Call (RFC) could not be carried out!
What causes this issue? The Remote Function Call (RFC) for copying the account assignment Customizing settings to the planning server (APO) could not...
VQ280
No consumption intervals have been maintained.
What causes this issue? No consumption intervals are entered in maintenance view V_T190V for info structure &v1&.System Response During the ...
Click on this link to search all SAP messages.