Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix VQ226 - Structure & for procedure & has no valid period type


SAP Error Message - Details

  • Message type: E = Error

  • Message class: VQ - SD Archiving and Product Allocation

  • Message number: 226

  • Message text: Structure & for procedure & has no valid period type

  • Show details Hide details
  • What causes this issue?

    The periodicity for the info structure is not maintained.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    Please enter a period unit in Customizing for updating and planning for
    the info structure.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message VQ226 - Structure & for procedure & has no valid period type ?

    The SAP error message:

    VQ226 Structure & for procedure & has no valid period type

    typically occurs in the context of costing-based CO-PA (Profitability Analysis) or account-based CO-PA when defining or processing valuation procedures and their associated structures.


    Cause

    • The error indicates that the valuation structure (or costing structure) assigned to a valuation procedure does not have a valid period type assigned.
    • In SAP CO-PA, each valuation structure must be linked to a valid period type (e.g., monthly, quarterly, yearly) to define the time granularity for which the valuation data is valid.
    • If the period type is missing or incorrectly maintained for the structure, the system cannot process the valuation procedure correctly, leading to this error.

    Where it occurs

    • During configuration or execution of valuation procedures in CO-PA.
    • When you assign a valuation structure to a valuation procedure.
    • When running costing or profitability reports that rely on these settings.

    Solution

    1. Check the Valuation Structure Configuration:

      • Go to transaction KE4S (Maintain Valuation Structures) or use the IMG path: Controlling -> Profitability Analysis -> Valuation -> Define Valuation Structures
      • Select the valuation structure mentioned in the error.
      • Verify that a valid period type is assigned to the structure.
    2. Assign a Valid Period Type:

      • If the period type is missing, assign an appropriate period type.
      • Common period types include:
        • 01 = Monthly
        • 02 = Quarterly
        • 03 = Yearly
      • The period type must be consistent with the business requirements and the way data is processed in CO-PA.
    3. Check the Valuation Procedure:

      • Go to transaction KE4V (Maintain Valuation Procedures).
      • Verify that the valuation procedure is correctly linked to the valuation structure with the valid period type.
    4. Transport and Testing:

      • After making changes, transport the configuration if necessary.
      • Test the costing or profitability analysis process again to confirm the error is resolved.

    Additional Information

    • Period Type defines the time interval for which the valuation data is valid and is crucial for period-based reporting and analysis.
    • Incorrect or missing period types can cause inconsistencies in CO-PA data aggregation and reporting.
    • Always ensure that the valuation structures and procedures are aligned with the organization's reporting periods.
    • If you are unsure about which period type to assign, consult your controlling or CO-PA functional consultant.

    Summary

    Aspect Details
    Error Message VQ226 Structure & for procedure & has no valid period type
    Cause Valuation structure linked to procedure lacks a valid period type
    Solution Assign a valid period type to the valuation structure in KE4S
    Transactions KE4S (Valuation Structures), KE4V (Valuation Procedures)
    Related Areas CO-PA configuration, Valuation procedures, Period types

    If you need further help, please provide the exact structure and procedure names, and the context in which the error occurs (e.g., during configuration, report execution, etc.).

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant