Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: V4 - Nachrichten Verkauf (Variable Meldungen und EDI-Meldungen)
Message number: 005
Message text: The material go-ahead start time lies after the mat.go-ahead end time
You have entered a material go-ahead start date that is later than the
material go-ahead end date.
The system does not allow the entry or generates a warning message.
Please correct your entries in the date fields for material release.
The material go-ahead cumulative quantity, which is supplied for
information purposes, cannot be correctly determined unless these two
fields are filled in correctly.
Error message extract from SAP system. Copyright SAP SE.
V4005
- The material go-ahead start time lies after the mat.go-ahead end time ?The SAP error message V4005, which states "The material go-ahead start time lies after the mat.go-ahead end time," typically occurs in the context of production planning and scheduling. This error indicates that there is a conflict in the scheduling of a material's go-ahead time, where the start time is set to occur after the end time, which is logically incorrect.
Cause:
- Incorrect Time Settings: The go-ahead start time and end time for the material are not set correctly in the system. This can happen due to manual entry errors or incorrect configuration in the material master or production order.
- Scheduling Conflicts: There may be overlapping or conflicting scheduling parameters that lead to this inconsistency.
- Data Migration Issues: If data has been migrated from another system, there may be inconsistencies in the time settings that were not properly adjusted during the migration process.
Solution:
Check Material Master Data: Review the material master data for the specific material in question. Ensure that the go-ahead start time and end time are correctly defined.
- Navigate to the material master (transaction code MM03) and check the relevant views (e.g., MRP, Production).
Review Production Orders: If the error is occurring in the context of a production order, check the production order details (transaction code CO03) to ensure that the scheduling parameters are set correctly.
Adjust Scheduling Parameters: If the go-ahead times are incorrect, adjust them to ensure that the start time is before the end time. This can be done in the production order or material master settings.
Check Configuration Settings: If the issue persists, review the configuration settings in the SAP system related to production planning and scheduling. This may involve checking the settings in SPRO (Customizing) for MRP and production scheduling.
Consult Documentation: Refer to SAP documentation or help resources for specific guidance on the configuration of go-ahead times and scheduling parameters.
Testing: After making adjustments, test the changes by attempting to create or process the production order again to ensure that the error does not reoccur.
Related Information:
By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Sign up for our Free Essentials Plan.
V4004
The production go-ahead start time lies after the prod.go-ahead end time
What causes this issue? You have entered a start date for cumulative production which is later than the end date for cumulative production.System Res...
V4003
The delivery date entered does not correspond to the document date
What causes this issue? You have entered a delivery date belonging to the last delivery note posted for this customer. It does not agree, however, wi...
V4006
The production go-ahead period is longer than the mat.go-ahead period
What causes this issue? You have entered a period for production go-ahead that is larger than the period for material go-ahead.System Response The s...
V4007
The beginning of the val.period of the dlv.sched.lies after its end
What causes this issue? You have entered a release order validity start date that is later than the release order validity end date.System Response ...
Click on this link to search all SAP messages.