Do you have any question about this error?
Message type: E = Error
Message class: UMG - Message Class for the Unicode Migration Tool.
Message number: 408
Message text: Report cannot be executed. Release info of CU&&UC procedure is wrong.
You execute the report UMG_FINISH_PREPARATION which is used to finish
the preparation for a Unicode conversion in a Combined Upgrade & Unicode
Conversion scenario (CU<(>&<)>UC).
The execution is not allowed because the release information stored in
table UM4STATUS does not match to release info expected by
UMG_FINISH_PREPARATION.
UMG_FINISH_PREPARATION can be executed in a CU<(>&<)>UC scenario only if
the basis start release of the Upgrade is 6.20 or 6.40.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
if you are not conducting a CU<(>&<)>UC procedure you do not need to
execute report UMG_FINISH_PREPARATION
if you are conducting a CU<(>&<)>UC procedure with a basis start release
6.20 and 6.40 you have to execute report UMG_FINISH_PREPARATION after
finishing the Upgrade
if you are conducting a CU<(>&<)>UC procedure with the basis start
release 4.6C you have to execute report UM4_FINISH_PREPARATION after
finishing the Upgrade
if you are conducting a CU<(>&<)>UC procedure and the table UM4STATUS is
empty you should check that all phases in the Upgrade finished without
error. Table UM4STATUS contains the most important steps of the
preparation for the a Unicode conversion in a CU<(>&<)>UC scenario
Error message extract from SAP system. Copyright SAP SE.
UMG408
- Report cannot be executed. Release info of CU&&UC procedure is wrong. ?Get instant SAP help. Start your 7-day free trial now.
UMG407
Report cannot be executed. Release info of CU&&UC procedure is wrong.
What causes this issue? You execute the report UM4_FINISH_PREPARATION which is used to finish the preparation for a Unicode conversion in a Combined ...
UMG406
Report cannot be executed. Status of CU&&UC procedure cannot be found.
What causes this issue? You execute the report UM4_FINISH_PREPARATION or UMG_FINISH_PREPARATION which is used to finish the preparation for a Unicode...
UMG409
Transaction SPUMG is currently locked. Undefined status (see long text).
What causes this issue? You called transaction SPUMG but a status check found that SPUMG cannot be executed because its status is currently not defin...
UMG410
Transaction SPUMG is currently locked. Finish &1 first.
What causes this issue? You called transaction SPUMG but it cannot be executed in its current status. Reason: According to the status table UM4STATU...
Click on this link to search all SAP messages.