Black Friday is ending this Friday! 40% off with coupon CYBER40 - Sign up here

Close

How To Fix UMB302 - First assign CPM variable &1 to a value field with characteristic &2


UMB302 - Overview

  • Message type: E = Error

  • Message class: UMB - SEM-CPM: Balanced Scorecard

  • Message number: 302

  • Message text: First assign CPM variable &1 to a value field with characteristic &2

  • Show details Hide details
  • What causes this issue?

    The CPM variable is not assigned to any value field and consequently to
    no BW report. This makes it difficult to select characteristic values in
    BW.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    First assign the CPM variable to at least one value field. The prerequis
    ite for this is that the corresponding characteristic is assigned to the
    BW report of the value field and that at least the time variable of the
    value field is filled with a value.

    Procedure for System Administrators


    Error message extract from SAP system. Copyright SAP SE.


UMB302 - Details

  • The SAP error message UMB302 indicates that there is an issue with the assignment of a characteristic to a value field in the context of the SAP Controlling (CO) module, specifically related to the use of the Cost Planning Module (CPM). This error typically arises when a characteristic (like a cost center, internal order, etc.) is not properly assigned to a value field in the planning layout or structure.
    
    Cause: The error occurs when: A characteristic (denoted as &2 in the error message) is not assigned to a value field (denoted as &1) in the planning layout. The system expects a value for a specific characteristic but cannot find it because it has not been properly configured or assigned.
    Solution: To resolve the UMB302 error, you can follow these steps: Check Planning Layout: Go to the planning layout configuration in SAP (transaction code KP06 for cost center planning, for example). Verify that the characteristic mentioned in the error message

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


UMB302 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant