Message type: E = Error
Message class: UMB - SEM-CPM: Balanced Scorecard
Message number: 272
Message text: Line &1: CPM variable '&2' cannot be selected
The CPM variable &V2& is assigned to the characteristic &V3&, but not
to the characteristic &V4&.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Select a suitable CPM variable.
Error message extract from SAP system. Copyright SAP SE.
UMB272
- Line &1: CPM variable '&2' cannot be selected ?The SAP error message UMB272 indicates that a specific characteristic or variable in the context of the SAP Controlling (CO) module, particularly in the context of the Cost Planning Module (CPM), cannot be selected for a particular line item. This error typically arises when there is an issue with the configuration or the data associated with the variable in question.
Cause: Variable Configuration: The variable '&2' may not be properly configured in the system. This could be due to missing settings or incorrect definitions in the variable settings. Data Availability: The data for the variable may not be available for the selected line item. This could happen if the variable is not relevant for the specific context or if there is no data associated with it. Authorization Issues: The user may not have the necessary authorizations to access the variable or the data associated with it. Incompatibility: The variable may not be compatible with the
Get instant SAP help. Sign up for our Free Essentials Plan.
UMB271
CPM variable '&1': No BW information available
What causes this issue? The CPM variable is not used in any value field. For this reason, the entry help cannot be created.System Response The syste...
UMB270
Choose a strategy first
What causes this issue? For the system, it is not clear for which strategy you want to perform a strategy analysis.System Response The system issues...
UMB273
New CPM variables identified in the scorecard
What causes this issue? In the scorecard &V1&, CPM variables are used in the value fields of measures and/or initiatives. However, at least o...
UMB274
Scorecard '&1': CPM variables found, which are no longer used
What causes this issue? Some CPM variables are not used by a measure or initiative. For this reason, they are not assigned to the scorecard when you ...
Click on this link to search all SAP messages.