How To Fix TU411 - Period length of alternative portion is not permitted


SAP Error Message - Details

  • Message type: E = Error

  • Message class: TU - Billing/Scheduling/Budget Billing

  • Message number: 411

  • Message text: Period length of alternative portion is not permitted

  • Show details Hide details
  • What causes this issue?

    You have entered alternative portion &v1&, which has a period length of
    &v2&. The meter reading unit in the installation refers to portion &v3&,
    which has the period length &v4&.
    The lengths do not correspond to the predefined guidelines. If the BAdI
    <LS>ISU_BFPS_APIV</> is active, a multiple of the period length of the
    alternative portion is permitted for the period length of the original
    portion.
    The period length of the original portion is not a multiple of the
    period length of the alternative portion here.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    Enter an alternative portion with an appropriate period length.

    Procedure for System Administrators


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message TU411 - Period length of alternative portion is not permitted ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker