Do you have any question about this error?
Message type: E = Error
Message class: TU - Billing/Scheduling/Budget Billing
Message number: 411
Message text: Period length of alternative portion is not permitted
You have entered alternative portion &v1&, which has a period length of
&v2&. The meter reading unit in the installation refers to portion &v3&,
which has the period length &v4&.
The lengths do not correspond to the predefined guidelines. If the BAdI
<LS>ISU_BFPS_APIV</> is active, a multiple of the period length of the
alternative portion is permitted for the period length of the original
portion.
The period length of the original portion is not a multiple of the
period length of the alternative portion here.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Enter an alternative portion with an appropriate period length.
Error message extract from SAP system. Copyright SAP SE.
TU411
- Period length of alternative portion is not permitted ?Get instant SAP help. Start your 7-day free trial now.
TU410
Alternative portion has different correction of non-workdays
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
TU409
Alternate portion has different factory calendar
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
TU412
No data exists for chosen selection criteria
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
TU413
Amount was changed despite item clearing
What causes this issue? When amounts were changed in event R976, the amount from a cleared item was also changed. This is not permitted.System Respon...
Click on this link to search all SAP messages.