Message type: E = Error
Message class:  TU - Billing/Scheduling/Budget Billing 
Message number: 409
Message text: Alternate portion has different factory calendar
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
The SAP error message TU409, which states "Alternate portion has different factory calendar," typically occurs in the context of transportation and logistics when dealing with alternate routes or portions of a transportation plan that are set up with different factory calendars. This can lead to inconsistencies in scheduling and planning.
Cause: The error arises when: Different Factory Calendars: The alternate portion of a transportation route or a shipment is assigned a factory calendar that differs from the primary portion. This can happen if the alternate route is set up with a different working schedule or holiday calendar.
Configuration Issues: There may be a misconfiguration in the master data for the materials, plants, or transportation lanes that leads to the use of different calendars. Data Inconsistencies: If the data for the alternate portion is not aligned with the primary portion, it can trigger this error.
Solution: To resolve the TU409 error, you can take the following steps: Check Factory
 Get instant SAP help. Sign up for our Free Essentials Plan.
Get instant SAP help. Sign up for our Free Essentials Plan. 
TU408 Alternative portion has different end of billing period
What causes this issue?  You have entered an alternative portion. The end of this portion's billing period is &V2&. The meter reading uni...
TU407 Contract &1 is a mandatory or exclusive contract
What causes this issue?  In event R964 (creating a pseudo-mandatory group using several optional contracts), you selected different optional contracts...
TU410 Alternative portion has different correction of non-workdays
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
TU411 Period length of alternative portion is not permitted
What causes this issue?  You have entered alternative portion &v1&, which has a period length of &v2&. The meter reading unit in the i...
Click on this link to search all SAP messages.