Do you have any question about this error?
Message type: E = Error
Message class: TU - Billing/Scheduling/Budget Billing
Message number: 409
Message text: Alternate portion has different factory calendar
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
TU409
- Alternate portion has different factory calendar ?Get instant SAP help. Start your 7-day free trial now.
TU408
Alternative portion has different end of billing period
What causes this issue? You have entered an alternative portion. The end of this portion's billing period is &V2&. The meter reading uni...
TU407
Contract &1 is a mandatory or exclusive contract
What causes this issue? In event R964 (creating a pseudo-mandatory group using several optional contracts), you selected different optional contracts...
TU410
Alternative portion has different correction of non-workdays
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
TU411
Period length of alternative portion is not permitted
What causes this issue? You have entered alternative portion &v1&, which has a period length of &v2&. The meter reading unit in the i...
Click on this link to search all SAP messages.