Message type: E = Error
Message class: TU - Billing/Scheduling/Budget Billing
Message number: 227
Message text: Creation of BB plan not possible, no schedule records for &1 for &2 &3
You attempted to create a budget billing plan. This is not possible
because no schedule records exist for a budget billing plan with this
creation date, for this meter reading unit.
One of the following has caused this:
Schedule records have been canceled.
Schedule records have not yet been generated.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Generate the missing schedule records for the budget billing period.
Error message extract from SAP system. Copyright SAP SE.
TU227
- Creation of BB plan not possible, no schedule records for &1 for &2 &3 ?The SAP error message TU227 ("Creation of BB plan not possible, no schedule records for &1 for &2 &3") typically occurs in the context of the SAP system when trying to create a business plan (BB plan) for a specific material or product. The error indicates that there are no scheduling records available for the specified material and plant combination.
Cause:
- Missing Scheduling Records: The most common cause of this error is that there are no scheduling records (such as production orders, planned orders, or purchase orders) available for the specified material in the specified plant.
- Incorrect Material or Plant: The material number or plant specified in the transaction may be incorrect or not exist in the system.
- Data Not Maintained: The necessary data for the material (like MRP data, production versions, etc.) may not be maintained in the system.
- Configuration Issues: There may be configuration issues in the MRP settings or in the planning strategy that prevent the creation of the BB plan.
Solution:
- Check Scheduling Records: Verify if there are any scheduling records for the specified material and plant. You can do this by checking the relevant transaction codes (like MD04 for stock/requirements list) to see if there are any open orders or requirements.
- Verify Material and Plant: Ensure that the material number and plant are correctly entered in the transaction. You can check the material master data to confirm that the material exists for the specified plant.
- Maintain Necessary Data: If the scheduling records are missing, you may need to create or maintain the necessary data for the material. This could include:
- Creating a production order or planned order.
- Ensuring that MRP data is correctly maintained in the material master.
- Checking if the material has a valid production version.
- Check MRP Configuration: Review the MRP configuration settings to ensure that they are set up correctly for the material and plant. This may involve checking the planning strategy, lot size settings, and other relevant parameters.
- Consult Documentation: If the issue persists, consult SAP documentation or reach out to your SAP support team for further assistance.
Related Information:
By following these steps, you should be able to identify the root cause of the TU227 error and implement the appropriate solution.
Get instant SAP help. Sign up for our Free Essentials Plan.
TU226
Cannot delete budget billing plan &1
What causes this issue? Budget billing plan &V1& cannot be deleted because clearings are already posted to at least one item, or at least one...
TU225
Start date for advance payment &1 is earlier than current date
What causes this issue? The start date you entered for advance payment is earlier than today's date.System Response The system issues an error ...
TU228
Cannot delete BB plan &1 because you have entered a different doc. number
What causes this issue? Budget billing plan cannot be deleted because at least one BB plan item is entered in either a collective bill (ABWTP = S) or...
TU229
No budget billing plan created for contract account &1
What causes this issue? No budget billing plan was created for contract account &V1&, because you entered 04 (payment schema) in the <LS&g...