Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: TU - Billing/Scheduling/Budget Billing
Message number: 184
Message text: Interval btw. sched. MR date and end MR period must be less than &1 days
This interval specifies the scheduled reading date in the schedule
records. To ensure that the allocation of portion schedule records to
meter reading schedule records is suitable, you must not make this
interval too long. With a period length of &V2& days this interval must
not be longer than &V1&.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
TU184
- Interval btw. sched. MR date and end MR period must be less than &1 days ?The SAP error message TU184 indicates that there is an issue with the scheduling of a maintenance plan in relation to the maintenance order or the maintenance period. Specifically, the error states that the interval between the scheduled maintenance release (MR) date and the end of the maintenance release period must be less than a specified number of days (denoted by &1).
Cause:
This error typically occurs due to one of the following reasons:
- Configuration Issue: The configuration settings for the maintenance plan or the scheduling parameters may not be set correctly.
- Date Settings: The scheduled maintenance release date is set too close to the end of the maintenance release period, violating the defined interval.
- Planning Parameters: The planning parameters for the maintenance plan may not align with the actual dates being used in the scheduling.
Solution:
To resolve the TU184 error, you can take the following steps:
Check Maintenance Plan Settings:
- Go to the maintenance plan in question and review the scheduling settings.
- Ensure that the scheduled MR date is appropriately set and that it allows for the required interval before the end of the MR period.
Adjust Dates:
- If the scheduled MR date is too close to the end of the MR period, adjust the date to ensure that the interval is less than the specified number of days.
- You may need to extend the maintenance release period or adjust the scheduling frequency.
Review Configuration:
- Check the configuration settings for the maintenance planning in the SAP system. Ensure that the parameters for scheduling and intervals are set correctly.
- If necessary, consult with your SAP configuration team to ensure that the settings align with your organization's maintenance planning strategy.
Test Changes:
- After making adjustments, test the changes by attempting to schedule the maintenance plan again to see if the error persists.
Consult Documentation:
- Refer to SAP documentation or help resources for more detailed information on maintenance planning and scheduling parameters.
Related Information:
By following these steps, you should be able to identify the cause of the TU184 error and implement a solution to resolve it.
Get instant SAP help. Sign up for our Free Essentials Plan.
TU183
Enter a permissible factory calendar
What causes this issue? You have selected the <LS>Include FactClr</> indicator (take factory calendar into account). You must therefore a...
TU182
Day-based periods not permissible for dynamic scheduling
What causes this issue? Day-based periods are not suitable for dynamic scheduling.System Response The system issues an error message and will not al...
TU185
&1 sched. recs for portion, &2 sched. recs for MR, &3 BB amounts deleted
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
TU186
Factory calendar is not maintained. Intervals are calculated in work days
What causes this issue? You have set the indicator <ZH><LS>Take factory calendar into account</> </>. However, you have not e...
Click on this link to search all SAP messages.