Message type: E = Error
Message class: TU - Billing/Scheduling/Budget Billing
Message number: 182
Message text: Day-based periods not permissible for dynamic scheduling
Day-based periods are not suitable for dynamic scheduling.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
To model day-based periods, use the functions available in dynamic
scheduling.
Error message extract from SAP system. Copyright SAP SE.
The SAP error message TU182, which states "Day-based periods not permissible for dynamic scheduling," typically occurs in the context of scheduling in SAP, particularly when working with production planning or project management modules. This error indicates that the system is trying to use day-based periods in a scenario where dynamic scheduling is not allowed.
Cause: Dynamic Scheduling Settings: The error arises when the system is configured to use dynamic scheduling, but the periods defined for the scheduling are day-based. Dynamic scheduling usually requires time-based periods (like hours or minutes) rather than day-based periods.
Configuration Issues: There may be a mismatch in the configuration settings for the scheduling parameters in the system. This could be due to incorrect settings in the production planning or project management configuration. Master Data Issues: The master data for the materials or resources involved may not be set up correctly, leading to the system attempting to use day-based periods.
Solution: Check Scheduling
Get instant SAP help. Sign up for our Free Essentials Plan.
TU181 Enter a period length
What causes this issue? You must enter either months or days for the period length. This specifies the period length of the portion.System Response ...
TU180 You cannot enter months as period length
What causes this issue? You have specified the period length in days. You are therefore not required to enter the number of months.System Response T...
TU183 Enter a permissible factory calendar
What causes this issue? You have selected the <LS>Include FactClr</> indicator (take factory calendar into account). You must therefore a...
TU184 Interval btw. sched. MR date and end MR period must be less than &1 days
What causes this issue? This interval specifies the scheduled reading date in the schedule records. To ensure that the allocation of portion schedule...
Click on this link to search all SAP messages.