Message type: E = Error
Message class: TU - Billing/Scheduling/Budget Billing
Message number: 180
Message text: You cannot enter months as period length
You have specified the period length in days. You are therefore not
required to enter the number of months.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
The SAP error message TU180, which states "You cannot enter months as period length," typically occurs when you are trying to define a period length in a transaction or configuration that does not accept months as a valid unit of time. This error is often encountered in the context of financial or controlling modules where period lengths are expected to be defined in days, weeks, or years, rather than months.
Cause: Incorrect Period Length Specification: The most common cause of this error is that the system is expecting a different unit of time (like days or weeks) but you have entered "months" as the period length. Configuration Settings: The configuration settings in the relevant module (like Financial Accounting, Controlling, etc.) may not support monthly periods for the specific transaction or report you are trying to execute. Transaction Context: The specific transaction or report you are using may not be designed to handle monthly periods,
Get instant SAP help. Sign up for our Free Essentials Plan.
TU179 You cannot enter days as period length
What causes this issue? You have specified the period length in months. You are therefore not required to enter the number of days.System Response T...
TU178 Cover sheet not maintained in main meter reading unit
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
TU181 Enter a period length
What causes this issue? You must enter either months or days for the period length. This specifies the period length of the portion.System Response ...
TU182 Day-based periods not permissible for dynamic scheduling
What causes this issue? Day-based periods are not suitable for dynamic scheduling.System Response The system issues an error message and will not al...
Click on this link to search all SAP messages.