Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: TU - Billing/Scheduling/Budget Billing
Message number: 175
Message text: Main portion &1 is not an MDE portion; allocation is not permitted
PDC meter reading unit &V2& may only be assigned another PDC meter
reading unit as its leading meter reading unit. You cannot assign PDC
meter reading unit &V2& to leading meter reading unit &V1& because &V1&
is not a PDC meter reading unit.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Delete the number in field "PDC number" or assign a PDC meter reading
unit as the leading meter reading unit.
Error message extract from SAP system. Copyright SAP SE.
TU175
- Main portion &1 is not an MDE portion; allocation is not permitted ?The SAP error message TU175 indicates that there is an issue with the allocation of a main portion in a material document. Specifically, it states that the main portion you are trying to allocate is not recognized as a "MDE portion" (Material Document Entry portion), which means that the system does not allow the allocation to proceed.
Cause:
- Incorrect Material Document: The main portion you are trying to allocate may not be correctly defined in the system as a valid MDE portion.
- Configuration Issues: There may be configuration issues in the system that prevent the main portion from being recognized as an MDE portion.
- Data Integrity Issues: There could be inconsistencies or errors in the data related to the material document or the portions defined within it.
- Incorrect Transaction: The transaction you are trying to perform may not be appropriate for the type of material or the specific document you are working with.
Solution:
- Check Material Document: Verify that the material document you are working with is correctly defined and that the portions are set up properly. Ensure that the main portion is indeed an MDE portion.
- Review Configuration: Check the configuration settings in the SAP system related to material management and document handling. Ensure that the settings align with the requirements for MDE portions.
- Data Consistency Check: Run data consistency checks to identify any discrepancies in the material documents or related data. Correct any inconsistencies found.
- Use Correct Transaction: Ensure that you are using the correct transaction code for the operation you are trying to perform. If necessary, consult the documentation or your SAP support team for guidance.
- Consult SAP Notes: Check the SAP Support Portal for any relevant SAP Notes that may address this specific error message. There may be patches or updates that resolve the issue.
Related Information:
By following these steps, you should be able to identify the cause of the TU175 error and implement a solution to resolve it.
Get instant SAP help. Sign up for our Free Essentials Plan.
TU174
Main portion &1 is MDE portion; allocation not permitted
What causes this issue? Meter reading unit &V2& will be assigned to leading meter reading unit &V1&, which is a PDC meter reading uni...
TU173
Schedule records still exist for portion &1
What causes this issue? You have set the <LS>Dyn. scheduling</> indicator (dynamic scheduling), so that this portion can be used for dyna...
TU176
Start month &1 falls after next billing date &2
What causes this issue? You specified starting month &V1& to create a payment plan. This will have the following effects: The next billing - ...
TU177
Enter 2 in Corr. holiday field
What causes this issue? You entered <LB>1</> for a factory calendar in <LS>Corr.holiday</> (correct holiday to workday) field...
Click on this link to search all SAP messages.