Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix TU176 - Start month &1 falls after next billing date &2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: TU - Billing/Scheduling/Budget Billing

  • Message number: 176

  • Message text: Start month &1 falls after next billing date &2

  • Show details Hide details
  • What causes this issue?

    You specified starting month &V1& to create a payment plan. This will
    have the following effects:
    The next billing - and thus the invoicing for this contract - is
    planned for &V2&.
    To create the payment plan for this invoicing, you have to set the
    starting month to &V3&. If the starting month you selected was used,
    the payment plan would not be created until the &V4& billing was
    invoiced.

    System Response

    How to fix this error?

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message TU176 - Start month &1 falls after next billing date &2 ?

    The SAP error message TU176 indicates that there is a mismatch between the start month of a billing plan and the next billing date. Specifically, it means that the start month you are trying to set falls after the next scheduled billing date. This can occur in various scenarios, such as when setting up a new billing plan or modifying an existing one.

    Cause:

    1. Incorrect Start Month: The start month you are trying to set is later than the next billing date.
    2. Billing Plan Configuration: The billing plan may not be configured correctly, leading to inconsistencies in the dates.
    3. Data Entry Error: There may have been a mistake in entering the dates or selecting the billing plan.

    Solution:

    To resolve the TU176 error, you can take the following steps:

    1. Check the Next Billing Date: Verify the next billing date in the billing plan. Ensure that the start month you are trying to set is not later than this date.

    2. Adjust the Start Month: If the start month is indeed after the next billing date, you will need to adjust it to a month that is before or equal to the next billing date.

    3. Review Billing Plan Settings: Go through the billing plan settings to ensure that all dates are correctly configured and that there are no discrepancies.

    4. Consult Documentation: If you are unsure about the correct settings, refer to SAP documentation or consult with your SAP administrator for guidance on billing plan configurations.

    5. Test Changes: After making adjustments, test the changes to ensure that the error is resolved and that the billing plan functions as expected.

    Related Information:

    • Transaction Codes: You may need to use transaction codes such as VF01 (Create Billing Document) or VF02 (Change Billing Document) to access and modify billing plans.
    • SAP Notes: Check SAP Notes for any known issues or patches related to billing plans and error TU176.
    • User Roles: Ensure that you have the necessary permissions to modify billing plans in SAP.

    By following these steps, you should be able to resolve the TU176 error and successfully configure your billing plan.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker