Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: TU - Billing/Scheduling/Budget Billing
Message number: 140
Message text: Date &1 already exists in another entry
You have attempted to create an entry that has the same date for the
end of the meter reading period as an existing entry. This is not
permitted.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Enter a different date.
Error message extract from SAP system. Copyright SAP SE.
TU140
- Date &1 already exists in another entry ?The SAP error message TU140, which states "Date &1 already exists in another entry," typically occurs in the context of time management or scheduling within SAP. This error indicates that the date you are trying to enter is already associated with another entry in the system, which can lead to conflicts or inconsistencies in data.
Cause:
- Duplicate Entries: The most common cause of this error is that there is already an existing record (such as a time entry, schedule, or other relevant data) that has the same date you are trying to input.
- Data Overlap: The system may be designed to prevent overlapping entries for the same date to maintain data integrity.
- Configuration Issues: Sometimes, the configuration settings in the system may not allow for multiple entries on the same date for specific processes.
Solution:
- Check Existing Entries: Review the existing entries for the date in question. You can do this by navigating to the relevant transaction or report where the entries are maintained. Look for any records that might conflict with the new entry you are trying to create.
- Modify or Delete Conflicting Entry: If you find a conflicting entry, you may need to modify or delete it, depending on your business requirements and data integrity rules.
- Use a Different Date: If the conflicting entry is valid and cannot be changed, consider using a different date for your new entry.
- Consult Documentation: Check the SAP documentation or help files related to the specific module you are working with for any additional guidelines on handling date entries.
- Contact Support: If you are unable to resolve the issue, consider reaching out to your SAP support team or consulting with an SAP expert who can provide further assistance.
Related Information:
By following these steps, you should be able to identify the cause of the TU140 error and take appropriate action to resolve it.
Get instant SAP help. Sign up for our Free Essentials Plan.
TU139
Additional periodic MR schedule record is not permitted in an MR unit
What causes this issue? You have attempted to enter an additional periodic meter reading schedule record for the meter reading unit. This is not perm...
TU138
Interval btw. sched. MR date and end MR period must be less than &1 days
What causes this issue? This interval defines the scheduled reading date in the schedule records. To ensure appropriate allocation of the meter readi...
TU141
Date &1 must be between &2 and &3
What causes this issue? You have attempted to enter a date that is not in the meter reading year to be processed.System Response The system issues a...
TU142
Note: date for end of meter reading period was changed
What causes this issue? The date you have changed could be the date for the end of the billing period that was copied from the portion. Note that thi...
Click on this link to search all SAP messages.