Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: TU - Billing/Scheduling/Budget Billing
Message number: 139
Message text: Additional periodic MR schedule record is not permitted in an MR unit
You have attempted to enter an additional periodic meter reading
schedule record for the meter reading unit. This is not permitted,
since only periodic meter reading datasets that match the corresponding
portion are allowed.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Enter a different meter reading reason, or delete the entry.
Error message extract from SAP system. Copyright SAP SE.
TU139
- Additional periodic MR schedule record is not permitted in an MR unit ?The SAP error message TU139, which states "Additional periodic MR schedule record is not permitted in an MR unit," typically occurs in the context of Material Requirements Planning (MRP) when there is an attempt to create or modify a scheduling record for a material that already has a periodic scheduling record defined.
Cause:
- Existing Scheduling Record: The error is triggered when there is already a periodic scheduling record for the material in the MRP unit, and the system does not allow the creation of an additional record.
- Configuration Issues: There may be configuration settings in the MRP or material master that restrict the creation of multiple periodic records.
- Data Integrity: The system is designed to maintain data integrity by preventing duplicate scheduling records that could lead to confusion in planning and execution.
Solution:
- Check Existing Records: Review the existing periodic scheduling records for the material in question. You can do this by navigating to the relevant transaction (e.g., MD04 for stock/requirements list) and checking the scheduling details.
- Modify Existing Record: If you need to change the scheduling, consider modifying the existing record instead of creating a new one. This can often be done through the material master or MRP views.
- Delete Unnecessary Records: If there are obsolete or unnecessary records, you may delete them if they are not needed. Ensure that this action is in line with your business processes.
- Consult Configuration: If you believe that the system should allow multiple records, consult with your SAP configuration team to review the settings related to MRP and periodic scheduling.
- Documentation and Support: Refer to SAP documentation for further details on periodic scheduling and MRP settings. If the issue persists, consider reaching out to SAP support for assistance.
Related Information:
By following these steps, you should be able to address the TU139 error effectively.
Get instant SAP help. Sign up for our Free Essentials Plan.
TU138
Interval btw. sched. MR date and end MR period must be less than &1 days
What causes this issue? This interval defines the scheduled reading date in the schedule records. To ensure appropriate allocation of the meter readi...
TU137
Enter a scheduled meter reading category
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
TU140
Date &1 already exists in another entry
What causes this issue? You have attempted to create an entry that has the same date for the end of the meter reading period as an existing entry. Th...
TU141
Date &1 must be between &2 and &3
What causes this issue? You have attempted to enter a date that is not in the meter reading year to be processed.System Response The system issues a...
Click on this link to search all SAP messages.