Do you have any question about this error?
Message type: E = Error
Message class: TU - Billing/Scheduling/Budget Billing
Message number: 007
Message text: Scheduled MR date &2 of &1 is only &3 days before end of billing period
The interval between the scheduled meter reading date and the scheduled
billing is only &V3& days long.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
If this was intentional, ignore this warning.
If the period should be longer, change the scheduled meter reading date
in the meter reading unit.
Error message extract from SAP system. Copyright SAP SE.
TU007
- Scheduled MR date &2 of &1 is only &3 days before end of billing period ?Get instant SAP help. Start your 7-day free trial now.
TU006
Internal: entry of parameter &1 in FM &2 required
What causes this issue? The function module you specified was called.System Response To function correctly, the function module requires the paramet...
TU005
Enter a permissible budget billing cycle
What causes this issue? In this field you can only enter budget billing cycles that have been defined in the <LS>Allowable date</> struct...
TU008
Billing period is shorter than meter reading period of meter reading unit
What causes this issue? The billing period is shorter than the meter reading period. Either the period length derived from the fields <LS>lengt...
TU009
Portion with final billing => no budget billing dates created
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.