Message type: E = Error
Message class: TU - Billing/Scheduling/Budget Billing
Message number: 005
Message text: Enter a permissible budget billing cycle
In this field you can only enter budget billing cycles that have been
defined in the <LS>Allowable date</> structure.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
The SAP error message TU005, which states "Enter a permissible budget billing cycle," typically occurs in the context of budget billing in SAP's Financial Accounting (FI) or Controlling (CO) modules. This error indicates that the budget billing cycle you are trying to enter is not valid or permissible according to the system's configuration.
Cause: Invalid Cycle Configuration: The budget billing cycle you are trying to enter may not be defined in the system. This could be due to incorrect settings in the configuration. Incorrect Input: The user may have entered a cycle that does not match the predefined cycles in the system. Missing Authorizations: Sometimes, the user may not have the necessary authorizations to access or modify certain billing cycles. Data Inconsistencies: There may be inconsistencies in the master data or configuration settings that lead to this error.
Solution: Check Configuration: Go to the configuration settings in SAP (transaction code SPRO). Navigate to the relevant section for budget billing
Get instant SAP help. Sign up for our Free Essentials Plan.
TU004 Enter a description
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
TU003 Enter 'change from' date from budget billing period (&1 - &2)
What causes this issue? The date you have entered is not in the budget billing period.System Response No adjustment can be made.How to fix this erro...
TU006 Internal: entry of parameter &1 in FM &2 required
What causes this issue? The function module you specified was called.System Response To function correctly, the function module requires the paramet...
TU007 Scheduled MR date &2 of &1 is only &3 days before end of billing period
What causes this issue? The interval between the scheduled meter reading date and the scheduled billing is only &V3& days long.System Respons...
Click on this link to search all SAP messages.