Message type: E = Error
Message class: T1 - Financial instruments
Message number: 214
Message text: 'Start of lead time' later than 'Start of hedging period'
In the 'Start of lead time' field, you have entered a later date than
the one in the 'Start of hedging period' field.
Change at least one of the dates.
Error message extract from SAP system. Copyright SAP SE.
T1214
- 'Start of lead time' later than 'Start of hedging period' ?The SAP error message T1214, which states that the "Start of lead time" is later than the "Start of hedging period," typically occurs in the context of materials planning and inventory management. This error indicates a mismatch in the timing of the lead time for a material and the hedging period defined in the system.
Cause:
- Configuration Issues: The lead time for a material is set to start after the hedging period begins. This can happen if the lead time is incorrectly configured in the material master or if the hedging period is not aligned with the lead time.
- Data Entry Errors: Incorrect data entry when defining the lead time or hedging period can lead to this error.
- Changes in Planning Parameters: If there have been recent changes to the planning parameters or settings, it may have resulted in this inconsistency.
Solution:
Check Material Master Data:
- Go to the material master record (transaction code MM03) and check the lead time settings. Ensure that the lead time starts before or at the same time as the hedging period.
Review Hedging Period Settings:
- Check the hedging period settings in the relevant configuration (transaction code OMD0 or similar). Ensure that the hedging period is set correctly and aligns with the lead time.
Adjust Lead Time or Hedging Period:
- If necessary, adjust either the lead time or the hedging period to ensure that the lead time starts before or at the same time as the hedging period.
Consult Documentation:
- Review SAP documentation or help files related to materials planning and hedging to understand the implications of these settings.
Testing:
- After making adjustments, perform a test run to ensure that the error does not reoccur and that the planning process works as expected.
Consult with SAP Support:
- If the issue persists after checking and adjusting the settings, consider reaching out to SAP support for further assistance.
Related Information:
By following these steps, you should be able to resolve the T1214 error and ensure that your materials planning processes function smoothly.
Get instant SAP help. Sign up for our Free Essentials Plan.
T1213
'Start of hedging period' later than/same as 'End of hedging period'
What causes this issue? In the 'Start of hedging period' field, you have entered a date which is either the same or later than that in the ...
T1212
'Start of lead time' same as 'Start of hedging period'
What causes this issue? In the 'Start of lead time' field, you have entered the same date as the 'Start of hedging period'. This ...
T1215
No premium percentage rate or amount determined
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
T1216
Fixing date cannot fall after start of hedging period
What causes this issue? You have entered a positive value for calculating the fixing date. The fixing date can only be before or on the date the hedg...