Message type: E = Error
Message class: T1 - Financial instruments
Message number: 212
Message text: 'Start of lead time' same as 'Start of hedging period'
In the 'Start of lead time' field, you have entered the same date as
the 'Start of hedging period'. This means that the FRA has no lead
time.
Error message extract from SAP system. Copyright SAP SE.
T1212
- 'Start of lead time' same as 'Start of hedging period' ?The SAP error message T1212, which states that the "Start of lead time" is the same as the "Start of hedging period," typically occurs in the context of materials management or production planning within SAP. This error indicates that there is a conflict in the configuration of lead times and hedging periods for a particular material or product.
Cause: Configuration Conflict: The lead time and hedging period are set to the same date, which is not allowed. The system expects these two periods to be distinct to ensure proper planning and execution. Data Entry Error: During the setup of the material master or planning parameters, the dates for lead time and hedging period may have been inadvertently set to the same value. Master Data Issues: The material master data may have inconsistencies or incorrect settings that lead to this error.
Solution: Review Material Master Data: Go to the material master record (transaction code MM03) and check the
Get instant SAP help. Sign up for our Free Essentials Plan.
T1211
'Start of lead time' later than 'End of hedging period'
What causes this issue? You have entered a date for the 'Start of lead time' that is later than the 'End of hedging period'.How t...
T1210
Premium has no payment date
What causes this issue? You did not enter all the required data for creating a premium.How to fix this error? Enter the following data: 'Effect...
T1213
'Start of hedging period' later than/same as 'End of hedging period'
What causes this issue? In the 'Start of hedging period' field, you have entered a date which is either the same or later than that in the ...
T1214
'Start of lead time' later than 'Start of hedging period'
What causes this issue? In the 'Start of lead time' field, you have entered a later date than the one in the 'Start of hedging period&...
Click on this link to search all SAP messages.