Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix T1212 - 'Start of lead time' same as 'Start of hedging period'


SAP Error Message - Details

  • Message type: E = Error

  • Message class: T1 - Financial instruments

  • Message number: 212

  • Message text: 'Start of lead time' same as 'Start of hedging period'

  • Show details Hide details
  • What causes this issue?

    In the 'Start of lead time' field, you have entered the same date as
    the 'Start of hedging period'. This means that the FRA has no lead
    time.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message T1212 - 'Start of lead time' same as 'Start of hedging period' ?

    The SAP error message T1212, which states that the "Start of lead time" is the same as the "Start of hedging period," typically occurs in the context of materials management or production planning within SAP. This error indicates that there is a conflict in the configuration of lead times and hedging periods for a particular material or product.

    Cause:

    1. Configuration Conflict: The lead time and hedging period are set to the same date, which is not allowed. The system expects these two periods to be distinct to ensure proper planning and execution.
    2. Data Entry Error: During the setup of the material master or planning parameters, the dates for lead time and hedging period may have been inadvertently set to the same value.
    3. Master Data Issues: The material master data may have inconsistencies or incorrect settings that lead to this error.

    Solution:

    1. Review Material Master Data:

      • Go to the material master record (transaction code MM03) and check the planning view.
      • Verify the settings for lead time and hedging period. Ensure that they are not set to the same date.
    2. Adjust Lead Time or Hedging Period:

      • If they are the same, adjust either the lead time or the hedging period to ensure they are distinct. This can be done in the material master or in the relevant planning configuration.
    3. Check Configuration Settings:

      • If you have access to configuration settings (transaction code SPRO), navigate to the relevant area for material management or production planning and check the settings for lead times and hedging periods.
      • Ensure that the configuration allows for distinct periods.
    4. Consult Documentation:

      • Review SAP documentation or help files related to lead times and hedging periods for additional context and best practices.
    5. Testing:

      • After making adjustments, perform a test run to ensure that the error does not reoccur and that the planning processes function as expected.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as MM03 (Display Material), MM02 (Change Material), and SPRO (Customizing).
    • SAP Notes: Check for any SAP Notes related to T1212 for additional insights or patches that may address this issue.
    • User Forums: Consider visiting SAP community forums or user groups for shared experiences and solutions from other users who may have encountered the same error.

    By following these steps, you should be able to resolve the T1212 error and ensure that your lead time and hedging period settings are correctly configured.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker