Do you have any question about this error?
Message type: E = Error
Message class: /SMB/Q2P_HC -
Message number: 004
Message text: Q2P: Checking import finished for Transport of Copies &1 in Status Change
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SMB/Q2P_HC004
- Q2P: Checking import finished for Transport of Copies &1 in Status Change ?The SAP error message
/SMB/Q2P_HC004
typically relates to issues encountered during the transport of copies in the SAP system. This error message indicates that there was a problem during the import process of a transport request, specifically when checking the status of the transport of copies.Cause:
- Transport Request Issues: The transport request may not have been properly released or may be in a status that does not allow it to be imported.
- Dependencies: There may be missing dependencies or objects that are required for the transport to be successful.
- Authorization Issues: The user performing the transport may not have the necessary authorizations to execute the import.
- System Configuration: There may be configuration issues in the transport management system (TMS) or the transport routes.
- Lock Entries: There could be lock entries in the system that prevent the transport from being processed.
Solution:
- Check Transport Request Status: Verify the status of the transport request in transaction SE09 or SE10. Ensure that it is released and ready for import.
- Review Logs: Check the transport logs for any specific errors or warnings that can provide more context on the failure. You can do this in transaction STMS.
- Check Dependencies: Ensure that all required objects and dependencies are included in the transport request. If necessary, create a new transport request that includes all dependencies.
- Authorization Check: Ensure that the user has the necessary authorizations to perform the transport. You may need to consult with your security team.
- TMS Configuration: Review the transport management system configuration to ensure that it is set up correctly. Check the transport routes and ensure that the target system is correctly defined.
- Clear Locks: If there are lock entries causing the issue, you may need to clear them. You can use transaction SM12 to check for and delete any unnecessary lock entries.
- Retry the Import: After addressing the above issues, try to re-import the transport request.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP Basis team or reach out to SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SMB/Q2P_HC003
Q2P: Consolidation Transport Request &1 was modified after consolidation
What causes this issue? During export and import of the transport of copies into Clean Client, the regular Q2P process does not allow changes to be p...
/SMB/Q2P_HC002
Q2P: Importing Transport of Copies &1 into Clean Client
What causes this issue? The import of the transport of copies &V1& into the Clean Client failed with return code > 8 due to a technical pr...
/SMB/Q2P_HC005
Q2P: Checking import log of Transport of Copies &1 for Status Change
What causes this issue? Q2P project status change to 'Test Import Finished' was triggered by the transport system, but the import of the co...
/SMB/Q2P_HC006
Q2P: Checking import finished for Cons. Transp. Requ. &1 in Status Change
What causes this issue? Q2P project status change to 'Import Finished' (BCP) or 'Completed' (LCP) was triggered by the transport ...
Click on this link to search all SAP messages.