Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: /SMB/Q2P_HC -
Message number: 002
Message text: Q2P: Importing Transport of Copies &1 into Clean Client
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SMB/Q2P_HC002
- Q2P: Importing Transport of Copies &1 into Clean Client ?The SAP error message
/SMB/Q2P_HC002
typically occurs when you are trying to import a Transport of Copies (ToC) into a clean client. This error can arise due to various reasons related to the transport process, client settings, or system configurations. Below are some potential causes, solutions, and related information for this error:Causes:
- Transport of Copies Restrictions: The system may have restrictions on importing Transport of Copies into a clean client, especially if the ToC is not meant for that client.
- Missing Authorizations: The user performing the import may not have the necessary authorizations to execute the transport.
- Client Settings: The target client may not be configured to accept transports, or it may be in a state that prevents imports (e.g., if it is a test client).
- Transport Directory Issues: There may be issues with the transport directory or the transport files themselves, such as corruption or missing files.
- Transport Layer Issues: The transport layer may not be correctly configured, or the transport route may not be set up properly.
Solutions:
- Check Transport Settings: Ensure that the transport settings for the target client allow for the import of Transport of Copies. You may need to consult with your Basis team to verify this.
- Verify Authorizations: Make sure that the user performing the import has the necessary authorizations. You can check this in transaction SU53 or by consulting with your security team.
- Review Client Configuration: Check the configuration of the target client to ensure it is set up correctly for imports. This includes checking if the client is in a modifiable state.
- Inspect Transport Files: Verify that the transport files are intact and not corrupted. You can do this by checking the transport directory and ensuring all necessary files are present.
- Use Correct Transport Layer: Ensure that the transport layer is correctly configured and that the transport route is set up properly. This can be checked in transaction STMS.
- Consult SAP Notes: Look for relevant SAP Notes that may address this specific error message. SAP Notes often provide solutions or workarounds for known issues.
Related Information:
If the issue persists after trying the above solutions, it may be beneficial to engage with SAP support for further assistance.
Get instant SAP help. Sign up for our Free Essentials Plan.
/SMB/Q2P_HC001
Q2P: Clean Client existence check at initialization
What causes this issue? Clean Client is not specified for current system. The system issues an error message and will not allow you to continue with ...
/SMB/Q2P_HC000
&1&2&3&4
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SMB/Q2P_HC003
Q2P: Consolidation Transport Request &1 was modified after consolidation
What causes this issue? During export and import of the transport of copies into Clean Client, the regular Q2P process does not allow changes to be p...
/SMB/Q2P_HC004
Q2P: Checking import finished for Transport of Copies &1 in Status Change
What causes this issue? Q2P project status change to 'Test Import Finished' was triggered by the transport system, but the import of the co...
Click on this link to search all SAP messages.