Do you have any question about this error?
Message type: E = Error
Message class: SI - Implementation Guide - Status control
Message number: 113
Message text: Planned resources adjusted
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
SI113
- Planned resources adjusted ?The SAP error message SI113 "Planned resources adjusted" typically occurs in the context of SAP's Project System (PS) or Production Planning (PP) modules. This message indicates that the system has automatically adjusted the planned resources for a project or production order based on certain criteria or constraints.
Cause:
- Resource Availability: The system may have detected that the originally planned resources (like labor, machines, or materials) are not available in the required quantities or at the required times.
- Capacity Constraints: If the capacity of the resources is exceeded, the system will adjust the planned resources to fit within the available capacity.
- Scheduling Conflicts: Conflicts in scheduling may lead to adjustments in resource allocation to ensure that tasks can still be completed on time.
- Changes in Project Scope: If there are changes in the project scope or requirements, the system may adjust resources accordingly.
Solution:
- Review Resource Availability: Check the availability of the resources in the system. Ensure that the required resources are available for the planned activities.
- Adjust Capacity Planning: If capacity constraints are causing the issue, consider adjusting the capacity planning settings or reallocating resources to balance the load.
- Check Scheduling: Review the scheduling of tasks and ensure that there are no conflicts. Adjust the schedule if necessary to allow for better resource allocation.
- Analyze Project Changes: If there have been recent changes to the project, analyze these changes and adjust the resource planning accordingly.
- Use Transaction Codes: Utilize relevant transaction codes (like CJ20N for project management or CO02 for production orders) to review and adjust the planned resources.
Related Information:
By following these steps, you should be able to identify the cause of the SI113 error message and implement the necessary solutions to resolve it.
Get instant SAP help. Start your 7-day free trial now.
SI112
Date format invalid for upload
What causes this issue? In MS Project a date format was used that cannot be converted to the SAP format.System Response The system issues an error m...
SI111
&
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
SI114
Values entered do not match dependent values
What causes this issue? The values you have entered for planned work, actual work and remaining work do not match the values in the dependent nodes. ...
SI115
Data is blocked by user &1 and could not be saved
What causes this issue? When you save data, the System aggregates it to a higher level. However, one of the nodes used to calculate the new data is l...
Click on this link to search all SAP messages.