How To Fix SD_PRODUCT_HIER019 - Validity period of assignment is changed.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: SD_PRODUCT_HIER - SD Product Hierarchy Messages

  • Message number: 019

  • Message text: Validity period of assignment is changed.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message SD_PRODUCT_HIER019 - Validity period of assignment is changed. ?
    The SAP error message SD_PRODUCT_HIER019 indicates that there is an issue with the validity period of an assignment in the product hierarchy. This typically occurs in the context of sales and distribution (SD) when there is a mismatch or conflict in the validity dates for product assignments.
    
    Cause: The error can be caused by several factors, including: Overlapping Validity Periods: If there are multiple assignments for the same product with overlapping validity periods, the system may not be able to determine which assignment to prioritize. Changes in Validity Dates: If the validity period of an existing assignment is changed, and there are other assignments that conflict with the new dates, this error may occur. Data Inconsistencies: There may be inconsistencies in the master data or configuration settings related to product hierarchies. Incorrect Configuration: The configuration settings for product hierarchies may not be set up correctly, leading to conflicts in validity periods.
    Solution: To resolve the SD_PRODUCT_HIER019 error, you

    Already have an account? Login here!


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker