How To Fix /SCMB/TMSRES_BP024 - First day of the assigned shift sequence must be greater 0


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SCMB/TMSRES_BP -

  • Message number: 024

  • Message text: First day of the assigned shift sequence must be greater 0

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SCMB/TMSRES_BP024 - First day of the assigned shift sequence must be greater 0 ?

    The SAP error message /SCMB/TMSRES_BP024 indicates that there is an issue with the shift sequence configuration in the SAP system, specifically that the first day of the assigned shift sequence must be greater than 0. This error typically arises in the context of SAP Advanced Planning and Optimization (APO) or SAP Supply Chain Management (SCM) when dealing with resource planning and scheduling.

    Cause:

    The error is caused by one of the following reasons:

    1. Incorrect Shift Sequence Configuration: The shift sequence assigned to a resource may have been defined incorrectly, with the first day set to 0 or not defined at all.
    2. Missing or Incomplete Data: The shift sequence might not have been fully configured, or there may be missing entries in the relevant tables.
    3. Data Migration Issues: If data was migrated from another system, there may have been issues during the migration process that resulted in incorrect or incomplete shift sequence data.

    Solution:

    To resolve this error, you can take the following steps:

    1. Check Shift Sequence Configuration:

      • Go to the transaction code for maintaining shift sequences (e.g., /SCMB/TMSRES or similar).
      • Verify the configuration of the shift sequence assigned to the resource. Ensure that the first day of the shift sequence is set to a value greater than 0.
    2. Adjust Shift Sequence:

      • If the first day is set to 0, change it to a valid value (e.g., 1 for the first day of the week).
      • Ensure that all necessary details for the shift sequence are filled out correctly.
    3. Review Resource Assignment:

      • Check the resource assignment to ensure that the correct shift sequence is linked to the resource in question.
    4. Data Consistency Check:

      • Run consistency checks in the system to identify any other potential issues with the configuration or data.
    5. Consult Documentation:

      • Refer to SAP documentation or help notes related to shift sequences and resource planning for additional guidance.
    6. Contact SAP Support:

      • If the issue persists after checking the configuration, consider reaching out to SAP support for further assistance.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes for managing resources and shift sequences in SAP SCM/APO.
    • SAP Notes: Look for SAP Notes that may address this specific error or provide additional troubleshooting steps.
    • Training and Documentation: Review training materials or documentation related to resource planning and shift management in SAP to ensure proper understanding and configuration.

    By following these steps, you should be able to resolve the error message /SCMB/TMSRES_BP024 and ensure that your shift sequences are configured correctly.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker