How To Fix /SCMB/TMSRES_BP025 - Capacity variant &1 is already assigned to shift sequence &2


/SCMB/TMSRES_BP025 - Overview

  • Message type: E = Error

  • Message class: /SCMB/TMSRES_BP -

  • Message number: 025

  • Message text: Capacity variant &1 is already assigned to shift sequence &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SCMB/TMSRES_BP025 - Capacity variant &1 is already assigned to shift sequence &2 ?
    The SAP error message /SCMB/TMSRES_BP025 indicates that a specific capacity variant is already assigned to a shift sequence, which is causing a conflict when trying to assign it again. This error typically arises in the context of SAP Advanced Planning and Optimization (APO) or SAP Supply Chain Management (SCM) when managing resources and their capacities.
    
    Cause: Duplicate Assignment: The capacity variant you are trying to assign is already linked to another shift sequence. Each capacity variant can only be assigned to one shift sequence at a time. Configuration Error: There may be a misconfiguration in the resource planning settings, leading to attempts to assign the same capacity variant to multiple shift sequences. Data Integrity Issues: There could be inconsistencies in the master data or configuration settings that are causing this conflict.
    Solution: Check Existing Assignments: Go to the relevant transaction in SAP (e.g., /SCMB/TMSRES or similar) and check the current assignments of the capacity variant. Identify

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author