How To Fix /SCMB/TMSRES_BP022 - Specify a capacity variant and end date


/SCMB/TMSRES_BP022 - Overview

  • Message type: E = Error

  • Message class: /SCMB/TMSRES_BP -

  • Message number: 022

  • Message text: Specify a capacity variant and end date

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SCMB/TMSRES_BP022 - Specify a capacity variant and end date ?
    The SAP error message /SCMB/TMSRES_BP022 indicates that a capacity variant and an end date need to be specified in the context of a transportation management scenario. This error typically arises when working with capacity planning or resource management in SAP Supply Chain Management (SCM).
    
    Cause: Missing Capacity Variant: The system requires a specific capacity variant to be defined for the resource or planning object you are working with. A capacity variant defines the characteristics of the resource, such as its availability, capacity, and other parameters. Missing End Date: The end date is necessary to determine the time frame for which the capacity is being planned or evaluated. Without this date, the system cannot proceed with the planning or scheduling.
    Solution: To resolve this error, you can take the following steps: Specify a Capacity Variant: Navigate to the relevant transaction or screen where you are trying to perform the operation. Look for a field labeled "Capacity Variant" or similar. Select

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant