How To Fix /SAPPCE/PNV105 - No change authorization for WBS element &1 construction progress report


/SAPPCE/PNV105 - Overview

  • Message type: E = Error

  • Message class: /SAPPCE/PNV -

  • Message number: 105

  • Message text: No change authorization for WBS element &1 construction progress report

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/SAPPCE/PNV105 - Details

  • The SAP error message /SAPPCE/PNV105 No change authorization for WBS element &1 typically occurs when a user attempts to make changes to a Work Breakdown Structure (WBS) element in a construction progress report but lacks the necessary authorization to do so. This is a common issue in SAP Project System (PS) and can be related to user roles and authorizations.
    
    Cause: Authorization Issues: The user does not have the required authorization to change the specified WBS element. This could be due to missing roles or authorizations in the user's profile. WBS Element Status: The WBS element may be in a status that does not allow changes (e.g., it might be locked or in a completed state). Project Settings: The project settings may restrict changes to certain users or roles.
    Solution: Check User Authorizations: Verify the user's roles and authorizations in the SAP system. This can be done by using transaction code SU53 immediately after the error occurs

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/SAPPCE/PNV105 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker