How To Fix /SAPPCE/PNV105 - No change authorization for WBS element &1 construction progress report


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPPCE/PNV -

  • Message number: 105

  • Message text: No change authorization for WBS element &1 construction progress report

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPPCE/PNV105 - No change authorization for WBS element &1 construction progress report ?

    The SAP error message /SAPPCE/PNV105 No change authorization for WBS element &1 typically occurs when a user attempts to make changes to a Work Breakdown Structure (WBS) element in a construction progress report but lacks the necessary authorization to do so. This is a common issue in SAP Project System (PS) and can be related to user roles and authorizations.

    Cause:

    1. Authorization Issues: The user does not have the required authorization to change the specified WBS element. This could be due to missing roles or authorizations in the user's profile.
    2. WBS Element Status: The WBS element may be in a status that does not allow changes (e.g., it might be locked or in a completed state).
    3. Project Settings: The project settings may restrict changes to certain users or roles.

    Solution:

    1. Check User Authorizations:

      • Verify the user's roles and authorizations in the SAP system. This can be done by using transaction code SU53 immediately after the error occurs to see what authorization checks failed.
      • Ensure that the user has the necessary authorizations for the WBS element, particularly for the activity type related to changing construction progress reports.
    2. Review WBS Element Status:

      • Check the status of the WBS element to ensure it is not locked or in a state that prevents changes. You can do this using transaction code CJ20N or CJ03 to view the WBS element details.
    3. Consult with Security Team:

      • If the user lacks the necessary authorizations, consult with your SAP security team to request the appropriate roles or authorizations be assigned to the user.
    4. Project Settings:

      • Review the project settings to ensure that there are no restrictions on who can make changes to the WBS elements. This may involve checking project profiles or settings in the Project System.
    5. Documentation and Training:

      • Ensure that users are trained on the authorization requirements and the processes for making changes to WBS elements.

    Related Information:

    • Transaction Codes:
      • SU53: Display Authorization Check
      • CJ20N: Project Builder
      • CJ03: Display WBS Element
    • Authorization Objects: Common authorization objects related to WBS elements include C_PROJ (Project Management) and C_PNVR (Project System: WBS Element).
    • SAP Notes: Check for any relevant SAP Notes that may address specific issues or provide additional guidance related to this error message.

    By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author