Do you have any question about this error?
Message type: E = Error
Message class: /SAPPCE/PNV -
Message number: 200
Message text: ********** Messages 200 - 299 reserved for cost/revenue planning
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPPCE/PNV200
- ********** Messages 200 - 299 reserved for cost/revenue planning ?The SAP error message
/SAPPCE/PNV200
with the description "Messages 200 - 299 reserved for cost/revenue planning" typically indicates that there is an issue related to cost or revenue planning in the SAP system. This error is often encountered in the context of SAP's Profitability Analysis (CO-PA) or other planning-related modules.Cause:
- Reserved Message Range: The error message indicates that the system is trying to access a message in the range of 200-299, which is reserved for cost/revenue planning. This could mean that the system is attempting to process a planning-related function that is not properly configured or is encountering an unexpected condition.
- Configuration Issues: There may be configuration issues in the planning settings, such as missing or incorrect settings in the planning area, planning version, or planning layout.
- Data Issues: There could be issues with the data being processed, such as missing master data, incorrect data formats, or inconsistencies in the planning data.
- Authorization Issues: The user may not have the necessary authorizations to perform the planning activities.
Solution:
- Check Configuration: Review the configuration settings for the planning area, version, and layout in the relevant planning module (e.g., CO-PA). Ensure that all necessary settings are correctly defined.
- Validate Data: Check the data being used in the planning process. Ensure that all required master data (e.g., cost centers, profit centers) is available and correctly maintained.
- Review User Authorizations: Ensure that the user has the necessary authorizations to access and perform the planning activities. This may involve checking roles and permissions in the SAP system.
- Consult Documentation: Refer to SAP documentation or notes related to the specific planning module you are using. There may be specific guidelines or troubleshooting steps provided by SAP.
- Check for SAP Notes: Search for relevant SAP Notes in the SAP Support Portal that may address this specific error message or provide additional context or fixes.
- Debugging: If you have access to technical resources, consider debugging the process to identify the exact point of failure and the underlying cause.
Related Information:
By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
/SAPPCE/PNV106
No display authorization for CPR for WBS element &1
<ZH>&CAUSE&</> You can only display performance notifications for WBS element &V1& if you have the correct authorization....
/SAPPCE/PNV105
No change authorization for WBS element &1 construction progress report
What causes this issue? You can only create or change performance notifications for WBS element &V1& if you have the correct authorization. F...
/SAPPCE/PNV201
CO version for CPR in controlling area &1 has not been maintained
What causes this issue? In Customizing for <ZK>Performance Notification and Valuation</> no CO version for updating performance notificat...
/SAPPCE/PNV202
Offset. accnt for controlling area &1 & project profile &2 not maintained
What causes this issue? In Customizing for <ZK>Performance Notification and Valuation</> no cost element is defined for the offsetting en...
Click on this link to search all SAP messages.