How To Fix /SAPPCE/PNV104 - Data for construction progress report & has been changed


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPPCE/PNV -

  • Message number: 104

  • Message text: Data for construction progress report & has been changed

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPPCE/PNV104 - Data for construction progress report & has been changed ?

    The SAP error message /SAPPCE/PNV104 typically indicates that there has been a change in the data related to a construction progress report. This error can occur in the context of project management and construction reporting within SAP, particularly when using the Project System (PS) module or related applications.

    Cause:

    The error message /SAPPCE/PNV104 is usually triggered by one of the following reasons:

    1. Data Modification: The data for the construction progress report has been modified after it was initially retrieved or processed. This could happen if another user or process has updated the report or related data.

    2. Concurrency Issues: If multiple users are trying to access or modify the same report simultaneously, it can lead to conflicts and result in this error.

    3. Incomplete Data: If the data required for the report is incomplete or has not been properly saved, it may lead to inconsistencies that trigger this error.

    Solution:

    To resolve the /SAPPCE/PNV104 error, you can take the following steps:

    1. Refresh the Data: If you suspect that the data has changed, refresh the report or the data you are working with. This can often resolve issues related to outdated information.

    2. Check for Concurrent Users: If you are working in a multi-user environment, check if another user is editing the same report. If so, coordinate with them to avoid conflicts.

    3. Review Changes: If you have access to change logs or history, review any recent changes made to the construction progress report to understand what might have caused the error.

    4. Re-enter Data: If the error persists, try re-entering the data for the construction progress report. Ensure that all required fields are filled out correctly.

    5. Consult Documentation: Refer to SAP documentation or help resources for specific guidance related to the error message. This can provide insights into any known issues or additional troubleshooting steps.

    6. Contact Support: If the issue cannot be resolved through the above steps, consider reaching out to your SAP support team or consulting with SAP support for further assistance.

    Related Information:

    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message. SAP frequently updates its knowledge base with solutions to common problems.
    • User Permissions: Ensure that you have the necessary permissions to access and modify the construction progress report. Lack of permissions can sometimes lead to unexpected errors.
    • System Logs: Review system logs for any additional error messages or warnings that may provide more context about the issue.

    By following these steps, you should be able to address the /SAPPCE/PNV104 error and continue working with your construction progress reports in SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author