Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/SNPOPT -
Message number: 237
Message text: Prod. &1 at loc. &2 is referenced by the 2 supersession chains &3 and &4
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/SNPOPT237
- Prod. &1 at loc. &2 is referenced by the 2 supersession chains &3 and &4 ?The SAP error message
/SAPAPO/SNPOPT237
indicates that a product at a specific location is being referenced by two different supersession chains. This situation can arise in the context of Advanced Planning and Optimization (APO) within SAP, particularly when dealing with product lifecycle management and product substitutions.Cause:
- Multiple Supersession Chains: The product in question is part of two different supersession chains, which can lead to conflicts in planning and execution. Supersession chains are used to manage the lifecycle of products, including their replacements and discontinuations.
- Data Integrity Issues: There may be inconsistencies or errors in the master data setup, leading to a product being incorrectly linked to multiple supersession chains.
- Configuration Errors: Incorrect configuration in the APO system regarding product relationships and supersession settings.
Solution:
- Review Supersession Chains: Check the configuration of the supersession chains in the system. Identify the two chains that reference the product and determine if both are necessary.
- Consolidate Supersession Chains: If possible, consolidate the supersession chains to ensure that the product is only referenced in one chain. This may involve updating the master data to reflect the correct relationships.
- Data Cleanup: Perform a data cleanup to remove any redundant or conflicting entries in the product master data. Ensure that the product is correctly assigned to the appropriate supersession chain.
- Consult Documentation: Refer to SAP documentation or guidelines on managing supersession chains to ensure compliance with best practices.
- Testing: After making changes, conduct thorough testing to ensure that the issue is resolved and that there are no further conflicts in the planning process.
Related Information:
/SAPAPO/SNPOPT
to access the relevant planning objects and configurations.By addressing the root cause of the error and ensuring proper configuration and data integrity, you can resolve the issue and prevent it from occurring in the future.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/SNPOPT236
Duration of PPM/PDS &1 is too long
What causes this issue? The production process model (PPM) or the production data structure (PDS) &V1& uses a resource &V2& for seque...
/SAPAPO/SNPOPT235
Product decomposition with cross-period lot-size planning is used
What causes this issue? You are using the product decomposition in connection with cross-period lot size planning.System Response In terms of the cr...
/SAPAPO/SNPOPT238
Product &1 at location &2 is referenced by the two FFF classes &3 and &4
What causes this issue? Two or more FFF classes are referring to a common product. This is not allowed in SNP Optimization. The products of the FFFcl...
/SAPAPO/SNPOPT239
Minimum capacity defined for a non-production resource &1 in bucket &2
What causes this issue? You have defined a minimum capacity for resource &1 in bucket &2, although it is not a production resource.System Res...
Click on this link to search all SAP messages.