Message type: E = Error
Message class: /SAPAPO/SNPOPT -
Message number: 235
Message text: Product decomposition with cross-period lot-size planning is used
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/SNPOPT235
- Product decomposition with cross-period lot-size planning is used ?The SAP error message
/SAPAPO/SNPOPT235
indicates that there is an issue with product decomposition in the context of cross-period lot-size planning in SAP Advanced Planning and Optimization (APO). This error typically arises when the system is unable to process the product decomposition due to the configuration or data setup.Cause:
- Cross-Period Lot Size Planning: The error suggests that the system is trying to perform product decomposition while cross-period lot-size planning is enabled. This can lead to conflicts if the product's decomposition structure is not compatible with the lot-sizing strategy being used.
- Configuration Issues: There may be configuration settings in the APO system that are not aligned with the requirements for product decomposition.
- Master Data Issues: The master data for the product (such as the product hierarchy, BOM, or routing) may not be set up correctly, leading to issues during planning.
- Planning Version: The planning version being used may not support the required decomposition or lot-sizing strategy.
Solution:
- Review Configuration: Check the configuration settings for cross-period lot-size planning and product decomposition. Ensure that they are compatible and correctly set up.
- Check Master Data: Verify the master data for the product, including the Bill of Materials (BOM) and routing. Ensure that they are correctly defined and that the product can be decomposed as expected.
- Adjust Lot Size Strategy: If necessary, consider adjusting the lot size strategy to one that is compatible with product decomposition. This may involve changing the lot-sizing procedure or the planning strategy.
- Planning Version: Ensure that the planning version being used supports the required settings for product decomposition and lot-size planning.
- Consult Documentation: Refer to SAP documentation or notes related to this error message for any specific recommendations or updates that may address the issue.
Related Information:
If the problem persists after trying the above solutions, it may be beneficial to consult with an SAP expert or your SAP support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/SNPOPT234
Product &2 cannot be substituted by product &3
What causes this issue? Due to the substitution rules of interchangeability group &V1&, it is not possible to substitute product &V2&...
/SAPAPO/SNPOPT233
All demand is frozen
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SNPOPT236
Duration of PPM/PDS &1 is too long
What causes this issue? The production process model (PPM) or the production data structure (PDS) &V1& uses a resource &V2& for seque...
/SAPAPO/SNPOPT237
Prod. &1 at loc. &2 is referenced by the 2 supersession chains &3 and &4
What causes this issue? Two or more supersession chains are referring to a common product. This is not allowed in SNP Optimization. The products of t...
Click on this link to search all SAP messages.