Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/SNPOPT -
Message number: 236
Message text: Duration of PPM/PDS &1 is too long
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/SNPOPT236
- Duration of PPM/PDS &1 is too long ?Cause: The SAP error message /SAPAPO/SNPOPT236 - Duration of PPM/PDS &1 is too long is usually caused when the duration of the Production Process Model (PPM) or Production Data Structure (PDS) exceeds the maximum limit set by the system. This could be due to incorrect configuration or data entry.
Solution: To resolve this issue, you need to check and adjust the duration of the PPM or PDS. This can be done by:
- Checking the configuration of the PPM or PDS in the system.
- Adjusting the duration of the PPM or PDS to fit within the maximum limit set by the system.
- Checking the data entry for any errors or inconsistencies that could be causing the duration to exceed the maximum limit.
Related Information: The Production Process Model (PPM) and Production Data Structure (PDS) are key components in SAP's Advanced Planner and Optimizer (APO) module. They are used to model the production process in the system, including the resources required, the duration of the process, and the output produced. The duration of the PPM or PDS is a critical factor in planning and scheduling production, and it needs to be accurately configured to ensure efficient and effective production planning.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/SNPOPT235
Product decomposition with cross-period lot-size planning is used
What causes this issue? You are using the product decomposition in connection with cross-period lot size planning.System Response In terms of the cr...
/SAPAPO/SNPOPT234
Product &2 cannot be substituted by product &3
What causes this issue? Due to the substitution rules of interchangeability group &V1&, it is not possible to substitute product &V2&...
/SAPAPO/SNPOPT237
Prod. &1 at loc. &2 is referenced by the 2 supersession chains &3 and &4
What causes this issue? Two or more supersession chains are referring to a common product. This is not allowed in SNP Optimization. The products of t...
/SAPAPO/SNPOPT238
Product &1 at location &2 is referenced by the two FFF classes &3 and &4
What causes this issue? Two or more FFF classes are referring to a common product. This is not allowed in SNP Optimization. The products of the FFFcl...
Click on this link to search all SAP messages.