How To Fix /SAPAPO/SNPOPT172 - Production process model/PDS &1 at loc. &2: Larger no. lots costs less


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/SNPOPT -

  • Message number: 172

  • Message text: Production process model/PDS &1 at loc. &2: Larger no. lots costs less

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/SNPOPT172 - Production process model/PDS &1 at loc. &2: Larger no. lots costs less ?

    The SAP error message /SAPAPO/SNPOPT172 typically occurs in the context of Advanced Planning and Optimization (APO) when dealing with production process models (PDS) in SAP. This error indicates that the system has detected a situation where the cost of producing a larger number of lots is less than the cost of producing a smaller number of lots. This can happen due to various reasons related to the configuration of the production process, cost settings, or the way the production process is modeled.

    Cause:

    1. Cost Configuration: The cost structure for the production process may be set up in such a way that economies of scale are not properly reflected. For example, fixed costs may be too high for smaller lot sizes, making larger lot sizes more cost-effective.

    2. Production Process Model (PDS) Settings: The settings in the PDS may not align with the expected cost behavior. This could include incorrect lot size settings, cost parameters, or other relevant configurations.

    3. Lot Size Calculation: The system may be calculating the lot sizes based on certain parameters that lead to this discrepancy in costs.

    4. Master Data Issues: There may be issues with the master data related to the materials, resources, or production processes that affect cost calculations.

    Solution:

    1. Review Cost Settings: Check the cost settings in the production process model. Ensure that the fixed and variable costs are set correctly to reflect the actual cost behavior of production.

    2. Adjust Lot Size Parameters: Review and adjust the lot size parameters in the PDS. Ensure that the lot size calculations are aligned with the expected production costs.

    3. Analyze PDS Configuration: Look into the PDS configuration to ensure that it accurately reflects the production process. This includes checking the routing, work centers, and any other relevant settings.

    4. Check Master Data: Verify the master data for the materials and resources involved in the production process. Ensure that all relevant data is accurate and up-to-date.

    5. Consult Documentation: Refer to SAP documentation or help resources for specific guidance on configuring production process models and cost settings.

    6. Engage with SAP Support: If the issue persists, consider reaching out to SAP support for assistance. They can provide insights based on the specific configuration and version of your SAP system.

    Related Information:

    • SAP APO Documentation: Review the official SAP documentation for APO, particularly sections related to production planning and process modeling.
    • Costing in SAP: Familiarize yourself with how costing works in SAP, including fixed and variable costs, and how they impact production planning.
    • Training and Resources: Consider training sessions or resources on SAP APO to better understand the intricacies of production planning and optimization.

    By addressing the underlying causes and following the suggested solutions, you should be able to resolve the error message and ensure that your production planning processes are functioning correctly.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker