Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/SNPOPT169
- Production process model/PDS &1: Execution ends outside of validity per. ?The SAP error message
/SAPAPO/SNPOPT169
indicates that there is an issue with the Production Data Structure (PDS) in the context of the Advanced Planning and Optimization (APO) module. Specifically, the error states that the execution of a production process model (PPM) is occurring outside of its defined validity period.Cause:
Validity Period Issue: The PDS has a defined validity period, and the execution date or time falls outside this range. This can happen if:
- The PDS is not valid for the date on which the production is being planned or executed.
- The PDS has been changed or deleted, and the new version is not valid for the planned execution date.
Incorrect Planning Parameters: The planning parameters or settings may not align with the validity of the PDS.
Master Data Changes: Changes in master data (like changes to the material, production process, or resources) that affect the PDS may not have been updated correctly.
Solution:
Check Validity Period:
- Go to the PDS in the APO system and check the validity dates. Ensure that the execution date falls within this range.
- If the PDS is not valid for the required date, you may need to extend the validity period or create a new PDS that covers the required dates.
Update PDS:
- If the PDS has been changed or is outdated, update it to reflect the current production processes and ensure it is valid for the required execution dates.
Review Planning Parameters:
- Check the planning parameters and ensure they are set correctly to align with the PDS validity.
Recreate or Adjust PDS:
- If necessary, recreate the PDS or adjust the existing one to ensure it meets the requirements for the planned production.
Consult Documentation:
- Review SAP documentation or notes related to PDS and validity periods for any additional insights or updates.
Related Information:
/SAPAPO/PDS
to view and manage PDS in the APO system.If the issue persists after checking the above points, it may be beneficial to consult with your SAP support team or refer to SAP community forums for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/SNPOPT168
Product &1 at location &2: Safety stock for a non-valid product
What causes this issue? Product &V1& is no longer valid at location &V2& from bucket &V3&. However, a dynamic safety days...
/SAPAPO/SNPOPT167
Product &1 at location &2: Safety stock violation costs
What causes this issue? A dynamic safety days' supply of &V3& days has been set for product &V1& at location &V2&. Howev...
/SAPAPO/SNPOPT171
Product &1 at location &2: External procurement of larger qty costs less
What causes this issue? You specified a piecewise linear cost function for externally procuring product &V1& at location &V2&. At poi...
/SAPAPO/SNPOPT172
Production process model/PDS &1 at loc. &2: Larger no. lots costs less
What causes this issue? You defined a piecewise linear cost function for executing production process model &V1& at location &V2&. At...
Click on this link to search all SAP messages.