Message type: E = Error
Message class: /SAPAPO/SNPOPT -
Message number: 162
Message text: Production process model/PDS &1: Cost function is missing
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/SNPOPT162
- Production process model/PDS &1: Cost function is missing ?The SAP error message /SAPAPO/SNPOPT162 indicates that there is a missing cost function in the Production Data Structure (PDS) for a specific production process model. This error typically arises in the context of Advanced Planning and Optimization (APO) when trying to perform planning activities that require cost calculations.
Cause: Missing Cost Function: The primary cause of this error is that the PDS for the specified production process model does not have an associated cost function defined. Cost functions are essential for calculating costs related to production processes, and their absence can lead to planning failures. Incorrect Configuration: There may be issues with the configuration of the production process model or the PDS itself, leading to the omission of the cost function. Data Inconsistencies: Inconsistencies in master data or configuration settings can also lead to this error.
Solution: Define Cost Function: Go to the transaction code /SAPAPO/PDS or use the relevant transaction for maintaining PDS. Locate the PDS for
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/SNPOPT161
No fixed consumption of resource &2 by production process model/PDS &1
What causes this issue? Production process model &V1& requires resource &V2&, for which cross-period lot size planning has been activ...
/SAPAPO/SNPOPT160
PPM/PDS &3 cannot be run in lot size planning horizon
What causes this issue? There is not sufficient capacity for the fixed resource consumption of PPM &V3& in any of the buckets between 1 and &...
/SAPAPO/SNPOPT163
Product &1 at location &2: Dynamic safety stock > shelf life
What causes this issue? You want to have a dynamic safety stock of &V3& days for product &V1& at location &V2&. This is longe...
/SAPAPO/SNPOPT164
Product &2 at location &3: COM error &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.