How To Fix /SAPAPO/SNPOPT160 - PPM/PDS &3 cannot be run in lot size planning horizon


/SAPAPO/SNPOPT160 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/SNPOPT -

  • Message number: 160

  • Message text: PPM/PDS &3 cannot be run in lot size planning horizon

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/SNPOPT160 - PPM/PDS &3 cannot be run in lot size planning horizon ?
    The SAP error message /SAPAPO/SNPOPT160 indicates that a Production Planning Model (PPM) or a Product Data Structure (PDS) cannot be executed within the specified lot size planning horizon. This error typically arises in the context of Advanced Planning and Optimization (APO) when the planning horizon does not align with the lot size requirements defined for the PPM or PDS.
    
    Cause: Lot Size Configuration: The lot size settings for the PPM or PDS may not be compatible with the planning horizon. For example, if the lot size is defined in such a way that it requires a larger time frame than what is currently set in the planning horizon, this error will occur. Planning Horizon Settings: The planning horizon in the APO system may be set too short, preventing the system from considering the necessary time frames for production or procurement. Data Inconsistencies: There may be inconsistencies or missing data in the PPM or PDS

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker