Message type: E = Error
Message class: /SAPAPO/SNPOPT -
Message number: 160
Message text: PPM/PDS &3 cannot be run in lot size planning horizon
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/SNPOPT160
- PPM/PDS &3 cannot be run in lot size planning horizon ?The SAP error message
/SAPAPO/SNPOPT160
indicates that a Production Planning Model (PPM) or a Product Data Structure (PDS) cannot be executed within the specified lot size planning horizon. This error typically arises in the context of Advanced Planning and Optimization (APO) when the planning horizon does not align with the lot size requirements defined for the PPM or PDS.Cause:
- Lot Size Configuration: The lot size settings for the PPM or PDS may not be compatible with the planning horizon. For example, if the lot size is defined in such a way that it requires a larger time frame than what is currently set in the planning horizon, this error will occur.
- Planning Horizon Settings: The planning horizon in the APO system may be set too short, preventing the system from considering the necessary time frames for production or procurement.
- Data Inconsistencies: There may be inconsistencies or missing data in the PPM or PDS that prevent it from being processed correctly within the defined planning horizon.
Solution:
- Adjust Planning Horizon: Review and extend the planning horizon in the APO system to ensure it encompasses the required time frames for the lot size planning. This can typically be done in the configuration settings of the APO system.
- Review Lot Size Settings: Check the lot size settings for the PPM or PDS. Ensure that they are defined correctly and that they align with the planning horizon. You may need to adjust the lot size parameters to fit within the planning horizon.
- Data Validation: Validate the PPM and PDS data to ensure that all necessary information is complete and correct. Look for any missing or incorrect entries that could be causing the issue.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on configuring lot sizes and planning horizons in your version of SAP APO.
Related Information:
/SAPAPO/PPM
or /SAPAPO/PDS
to access and modify the relevant settings.By addressing the planning horizon and lot size settings, you should be able to resolve the error and successfully run the PPM or PDS in the desired planning context.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/SNPOPT159
Production process model/PDS &1: Cannot be executed
What causes this issue? Production process model &V1& at location &V2& is intended for cross-period lot size planning. It can be star...
/SAPAPO/SNPOPT158
Production process model/PDS &1: Fixed resource consumption not allowed
What causes this issue? Production process model &V1& is using resource &V2& that is intended for cross-period lot size planning. How...
/SAPAPO/SNPOPT161
No fixed consumption of resource &2 by production process model/PDS &1
What causes this issue? Production process model &V1& requires resource &V2&, for which cross-period lot size planning has been activ...
/SAPAPO/SNPOPT162
Production process model/PDS &1: Cost function is missing
What causes this issue? Cross-period lot size planning is active for production process model &V1&. In this instance, the SNP optimizer would...
Click on this link to search all SAP messages.